Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T11CM00333
Permit Details
Apply Date:
01/31/2011
Applicant:
N/A
Description:
TI: BUFFLO EXCHANGE
Contractors:
- CHIP EISNER
Permit Reviews
Permit Number - T11CM00333
Permit Status: Final
Permit Description: TI: BUFFLO EXCHANGE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/31/2011 | COMMERCIAL - TI | 02/01/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T11CM00333
Permit Status: Final
Permit Description: TI: BUFFLO EXCHANGE
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
01/31/2011 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T11CM00333
Permit Description: TI: BUFFLO EXCHANGE
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/04/2011 | ENGINEERING - FINAL | JFEMLING | Approved | COntractor called ofr an inspection of trench but what he needed was a foundation inspection. He had LeeRay approve inspection. |
02/07/2011 | STEM WALL/RETAINING WALL | LHANLY | Approved | |
02/07/2011 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | |
03/15/2011 | ELECTRIC - INTERMEDIATE | LHANLY | Approved | |
03/15/2011 | FRAMING | LHANLY | Approved | |
03/30/2011 | BUILDING - FINAL | LHANLY | Approved | |
03/30/2011 | FIRE - FINAL | DRAMIREZ | Approved | |
03/30/2011 | BUILDING - FINAL | LHANLY | Approved | POST ADDRESS REPAIR THRESHOLD AS NOTED POST "WATCH YOUR STEP" SIGN PROVIDE APPROVED FIRE FINAL |
03/30/2011 | ELECTRIC - FINAL | LHANLY | Approved | |
03/30/2011 | ELECTRIC - ABOVE CEILING | LHANLY | Approved | |
03/30/2011 | SHEET ROCK NAILING | LHANLY | Approved | |
03/30/2011 | BUILDING ABOVE CEILING | LHANLY | Approved |