Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address NEW:
3520 S SANDARIO RD
Apply Date:
11/23/2010
Applicant:
PETER ABRAHAMS
Description:
FLOODPLAIN USE PERMIT Tucson H2O Well SA-015A
Contractors:
  • P AND H CONTRACTING INC ,

Permit Reviews

Permit Number - T10OT02518
Permit Status: Final
Permit Description: FLOODPLAIN USE PERMIT Tucson H2O Well SA-015A
Start Date Submittal Complete Date Status  
11/23/2010 FLOODPLAIN 12/28/2010 ACTIVE Review Details
11/23/2010 FLOODPLAIN 11/23/2010 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T10OT02518
Permit Status: Final
Permit Description: FLOODPLAIN USE PERMIT Tucson H2O Well SA-015A
Total Outstanding Activity Conditions - 1
Date Name
12/01/2010 a) This permit is for the initial phase of the Tucson Water SAVSARP well improvements SA-015A & phase 1 only. b) The Southern Avra Valley Storage And Recovery Project (SAVSARP) Well SA-015A Phase 1 plans - Tucson Water Plan No.1-017-2010 (SA-015A) and specifications are a part of the grading permit. See also Floodplain Analysis Summary Report for Southern Avra Valley Storage and Recovery Project (SAVSARP) Planned Recovery-Well Pad Sites by TetraTech dated December 9, 2009, sealed 12/09/09 Michael Zeller, P.E. c) Minimum pad elevation and well structure shall be set above the jurisdictional water surface to the elevation, as shown on the approved plans and drainage report, and shall be certified by an RLS. d) Submit completed elevation certificates to City of Tucson Planning & Development Services Department Engineering Division for acceptance. For SAVSARP Well SA-015A, submit first elevation certificate after compaction and completion of the fill pad, indicating minimum pad grade of 2306.61, and final elevation certificate indicating minimum elevation of top of well casing set at 2308.61. e) Submit a copy of the as-builts to City of Tucson Planning & Development Services Department upon completion.