Permit Details

Status:
Closed
Type:
RIGHT OF WAY IMPROVMENTS
Address NEW:
1290 W MIRACLE MILE
Apply Date:
08/30/2010
Applicant:
FLOWING WELLS IRRIGATION DIST *C
Description:
EXCV 8' X 8' TRENCH TO REPAIR BROKEN BALVE ASSEMBLY LOCATED IN THE EASTBOUND INSIDE LANE FO MIRACLE MILE AT THE INTERSECTION OF EL BURRITO AVE AND A 4' X 6' TRENCH TO ABANDON 2" WATER LINE IN THE EASTBOUND INSIDE LANE OF MIRACLE MILE +/- 280 WEST OF THE CL OF EL BURRITO AVE. TRENCH BACKFILL AND PAVEMENT REPLACEMENT SHALL BE PER ADOT POLICY FOR ACCOMMODATING UTILIES ON HIGHWAY RIGHT OF WAY, SEC 4.2 TRENCH MUCT BE SLURRY BACKFILLED PER (ALTERNATIVE B) 4.2.3.1.B, AND PAVEMENT REPL PER (STANDARD ASPHALTIC CONCRETE PAVEMENT REPL) SEC. 4.2.3.4.A
Contractors:
  • FLOWING WELLS IRRIGATION DIST *C

Outstanding Activity Conditions

Permit Number - T10EX00438
Permit Status: Closed
Permit Description: EXCV 8' X 8' TRENCH TO REPAIR BROKEN BALVE ASSEMBLY LOCATED IN THE EASTBOUND INSIDE LANE FO MIRACLE MILE AT THE INTERSECTION OF EL BURRITO AVE AND A 4' X 6' TRENCH TO ABANDON 2" WATER LINE IN THE EASTBOUND INSIDE LANE OF MIRACLE MILE +/- 280 WEST OF THE CL OF EL BURRITO AVE. TRENCH BACKFILL AND PAVEMENT REPLACEMENT SHALL BE PER ADOT POLICY FOR ACCOMMODATING UTILIES ON HIGHWAY RIGHT OF WAY, SEC 4.2 TRENCH MUCT BE SLURRY BACKFILLED PER (ALTERNATIVE B) 4.2.3.1.B, AND PAVEMENT REPL PER (STANDARD ASPHALTIC CONCRETE PAVEMENT REPL) SEC. 4.2.3.4.A
Total Outstanding Activity Conditions - 2
Date Name
08/30/2010 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
08/30/2010 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.

Documents

File Name Document Type  
None DOCUMENTS VIEW