Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Apply Date:
07/20/2010
Applicant:
N/A
Description:
TUCSON WATER:EAST SIDE FACILITY/OFFICE/SHOP
Architects:
  • FERRANTI, KIM MERRIMAN
Contractors:
  • LANG WYATT CONSTRUCTION ,

Permit Reviews

Permit Number - T10CM02010
Permit Status: C of o
Permit Description: TUCSON WATER:EAST SIDE FACILITY/OFFICE/SHOP
Start Date Submittal Complete Date Status  
02/24/2011 3RD PARTY REVIEW - REVISION/OTHER 05/20/2011 COMPLETED Review Details
05/20/2011 3RD PARTY REVIEW - REVISION/OTHER 05/26/2011 COMPLETED Review Details
07/20/2010 PLANS OK TO SUBMIT - 3RD PARTY 07/20/2010 COMPLETED Review Details
07/20/2010 3RD PARTY REVIEW-COMMERCIAL 10/04/2010 COMPLETED Review Details
10/04/2010 POST 3RD PARTY REVIEW 11/23/2010 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T10CM02010
Permit Status: C of o
Permit Description: TUCSON WATER:EAST SIDE FACILITY/OFFICE/SHOP
Total Outstanding Activity Conditions - 1
Date Name
07/20/2010 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T10CM02010
Permit Description: TUCSON WATER:EAST SIDE FACILITY/OFFICE/SHOP
Total Completed Inspections - 42
Date Description Inspector Results Comments
12/21/2010 EXCAVATION/LAYOUT REBAR & ZON GDABBS Approved IVRS - Inspection :*
1) SCREEN WALL FOOTINGS AT EAST SIDE 8' HIGH CMU WALL PER PIMA COUNTY STANDARD DETAIL #109-459 L.F. SPECIAL INSPECTION PERFORMED BY D. NELSON OF STRUCTURAL CONCEPTS OK
12/29/2010 ELECTRIC - UNDERGROUND RJIROUDE Approved IVRS - Inspection :*
1) OK U.G. FOR BRANCH CIRCUITS BLDG SLAB
04/05/2011 REINFORCED MASONRY PRE-GROUT GDABBS Approved IVRS - Inspection :* SCREEN WALL & TRASH ENCLOSERE TOP OUT
06/10/2011 ELECTRIC - ABOVE CEILING RMORENO Approved IVRS - Inspection :*
1) GROUNDING IN WAREHOUSE BLDG OK
2) SHOP BLDG SWITCH GEAR OK
3) GROUNDING IN BLDG AND OFFICE OK
4) CEILINGS IN BLDG FOR SHOP OK AND OFFICE
06/10/2011 ELECTRIC - CABLE DROP RMORENO Approved IVRS - Inspection :*
06/22/2011 TEP CLEARANCE - AM JWEATHER Approved ECO CLEARED PER R. MORENO
06/23/2011 ELECTRIC - TEMP POWER FOR TEST RMORENO Approved IVRS - Inspection :*
07/11/2011 FRAMING GDABBS Approved IVRS - Inspection :*
1) INTERIOR 10' HIGH WALLS-FRAMING COMPLETE
07/14/2011 SHEET ROCK NAILING GDABBS Approved IVRS - Inspection :*
07/14/2011 BUILDING ABOVE CEILING GDABBS Approved IVRS - Inspection :*
07/18/2011 PLUMBING - GAS PRESS TEST FNL RRICH Approved IVRS - Inspection :*
07/18/2011 PLUMBING - GAS PRESSURE TEST RRICH Approved IVRS - Inspection :*
07/18/2011 PLUMBING - PRE SLAB RRICH Approved IVRS - Inspection :*
07/18/2011 PLUMBING - ROUGH, SOIL RRICH Approved IVRS - Inspection :*
08/05/2011 FIRE SPKLR - UG PIPING FLUSH DSIWARSKI Approved 5010 approved by Tucson Water per Terry Heffernan.
08/05/2011 FIRE SPKLR - UG, PIPING, HYDRO DSIWARSKI Approved 5005 approved by Tucson Warter per Terry Heffernan.
08/08/2011 FIRE - HYDRANTS DSIWARSKI Approved
09/14/2011 PLUMBING - YARD WTR LINE/TEST RRICH Approved IVRS - Inspection :*
1) DO YOU REALLY WANT (2) RPA BACKFLOW ASSEMBLIES INSTALLED ON THE SERVICE ENTRY ?
09/14/2011 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection :*
09/29/2011 U VALUE FOR WINDOW GDABBS Approved IVRS - Inspection :*
10/04/2011 ROOF NAILING JBURGE Approved IVRS - Inspection :*
10/04/2011 EXT METAL CLIPS/EXT SHEATHING JBURGE Approved IVRS - Inspection :*
11/14/2011 FIRE - ALARM FINAL DSIWARSKI Approved
11/14/2011 FIRE SPKLR - FINAL DSIWARSKI Approved
11/16/2011 OUTDOOR LIGHTING FINAL RMORENO Approved IVRS - Inspection :*
11/16/2011 ELECTRIC - FINAL RMORENO Approved IVRS - Inspection :*
11/16/2011 ELECTRIC - OUTDOOR LIGHTING RMORENO Approved IVRS - Inspection :*
11/16/2011 ELECTRIC - INTERMEDIATE RMORENO Approved IVRS - Inspection :*
11/16/2011 ELECTRIC - UFER RMORENO Approved IVRS - Inspection :*
12/01/2011 PLUMBING - FINAL BBENEDON Approved IVRS - Inspection :*
12/01/2011 SITE - SEWER BBENEDON Approved IVRS - Inspection :*
12/01/2011 PLUMBING - ABOVE CEILING BBENEDON Approved IVRS - Inspection :*
12/07/2011 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
12/07/2011 MECHANICAL - ABOVE CEILING JMILITEL Approved IVRS - Inspection :*
12/07/2011 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
12/08/2011 BUILDING - FINAL JBURGE Approved IVRS - Inspection :*
12/09/2011 FIRE - FINAL WMOTTO Approved
12/12/2011 NPPO - FINAL DROBERTS Approved N.P.P.O. PLANTS HAVE NOT BEEN INSTALLED PER THE APPROVED PLANS. PROVIDE REVISED DRAWINGS SHOWING THE CHANGES THAT HAVE BEEN MADE TO THIS SITE, OR PLANT MATERIAL AS SHOWN ON THE APPROVED PLANS.
12/12/2011 LANDSCAPE - FINAL DROBERTS Approved UNABLE TO LOOK OVER THE SITE TODAY BUT WILL START THE PLANT INVENTORY TOMORROW FOR ALL OF THE SITE.
12/12/2011 SIGN - FINAL DROBERTS Approved
12/12/2011 ENGINEERING - FINAL DROBERTS Approved STARTED LOOKING OVER THE SITE, CREWS ARE STILL WORKING ON THE LANDSCAPING ITEMS AS WELL AS WITH THE AREAS AROUND THE STRUCTURES. THIS SITE WILL BE CHECKED AT A LATER DATE TO SEE IF ALL OF THE WORK HAS BEEN COMPLETED, AND AS-BUILT DRAWINGS SUBMITTED FOR ALL OF THE CHANGES THAT HAVE BEEN MADE.
04/30/2012 RIGHT OF WAY - FINAL RLEIGH Approved

Documents

File Name Document Type  
C OF O_04-30-2012.TIF CERT OF OCC VIEW
001_E1.TIF CONSTRPLANS VIEW
002_E2.TIF CONSTRPLANS VIEW
003_E3.TIF CONSTRPLANS VIEW
004_E4.TIF CONSTRPLANS VIEW
005_E5.TIF CONSTRPLANS VIEW
006_E6.TIF CONSTRPLANS VIEW
007_E7.TIF CONSTRPLANS VIEW
008_E8.TIF CONSTRPLANS VIEW
009_E9.TIF CONSTRPLANS VIEW
010_E10.TIF CONSTRPLANS VIEW
011_F1.TIF CONSTRPLANS VIEW
012_F2.TIF CONSTRPLANS VIEW
013_E1.TIF CONSTRPLANS VIEW
014_E2.TIF CONSTRPLANS VIEW
015_E3.TIF CONSTRPLANS VIEW
016_E4.TIF CONSTRPLANS VIEW
017_E5.TIF CONSTRPLANS VIEW
018_E6.TIF CONSTRPLANS VIEW
019_E7.TIF CONSTRPLANS VIEW
020_E8.TIF CONSTRPLANS VIEW
021_E9.TIF CONSTRPLANS VIEW
022_E10.TIF CONSTRPLANS VIEW
023_E11.TIF CONSTRPLANS VIEW
024_E12.TIF CONSTRPLANS VIEW
025_E13.TIF CONSTRPLANS VIEW
026_F1.TIF CONSTRPLANS VIEW
027_E1.TIF CONSTRPLANS VIEW
028_E2.TIF CONSTRPLANS VIEW
029_E3.TIF CONSTRPLANS VIEW
030_E4.TIF CONSTRPLANS VIEW
031_E5.TIF CONSTRPLANS VIEW
032_E6.TIF CONSTRPLANS VIEW
033_E7.TIF CONSTRPLANS VIEW
034_E8.TIF CONSTRPLANS VIEW
035_E9.TIF CONSTRPLANS VIEW
036_E10.TIF CONSTRPLANS VIEW
037_E11.TIF CONSTRPLANS VIEW
038_E12.TIF CONSTRPLANS VIEW
039_F1.TIF CONSTRPLANS VIEW
040_F2.TIF CONSTRPLANS VIEW
001_G001.TIF CONSTRPLANS VIEW
002_L101.TIF CONSTRPLANS VIEW
003_L102.TIF CONSTRPLANS VIEW
004_L103.TIF CONSTRPLANS VIEW
005_L104.TIF CONSTRPLANS VIEW
006_L105.TIF CONSTRPLANS VIEW
007_L106.TIF CONSTRPLANS VIEW
008_L107.TIF CONSTRPLANS VIEW
009_L108.TIF CONSTRPLANS VIEW
010_L109.TIF CONSTRPLANS VIEW
011_L110.TIF CONSTRPLANS VIEW
012_L111.TIF CONSTRPLANS VIEW
013_S1.TIF CONSTRPLANS VIEW
014_S2.TIF CONSTRPLANS VIEW
015_S3.TIF CONSTRPLANS VIEW
016_S4.TIF CONSTRPLANS VIEW
017_S5.TIF CONSTRPLANS VIEW
018_S6.TIF CONSTRPLANS VIEW
019_S7.TIF CONSTRPLANS VIEW
020_S8.TIF CONSTRPLANS VIEW
021_AS101.TIF CONSTRPLANS VIEW
022_A001.TIF CONSTRPLANS VIEW
023_A101.TIF CONSTRPLANS VIEW
024_A102.TIF CONSTRPLANS VIEW
025_A103.TIF CONSTRPLANS VIEW
026_A104.TIF CONSTRPLANS VIEW
027_A105.TIF CONSTRPLANS VIEW
028_A121.TIF CONSTRPLANS VIEW
029_A201.TIF CONSTRPLANS VIEW
030_A210.TIF CONSTRPLANS VIEW
031_A211.TIF CONSTRPLANS VIEW
032_A301.TIF CONSTRPLANS VIEW
033_A302.TIF CONSTRPLANS VIEW
034_A401.TIF CONSTRPLANS VIEW
035_A402.TIF CONSTRPLANS VIEW
036_A403.TIF CONSTRPLANS VIEW
037_A404.TIF CONSTRPLANS VIEW
038_A405.TIF CONSTRPLANS VIEW
039_A501.TIF CONSTRPLANS VIEW
040_A502.TIF CONSTRPLANS VIEW
041_A503.TIF CONSTRPLANS VIEW
042_A504.TIF CONSTRPLANS VIEW
043_A505.TIF CONSTRPLANS VIEW
044_A506.TIF CONSTRPLANS VIEW
045_A601.TIF CONSTRPLANS VIEW
046_A602.TIF CONSTRPLANS VIEW
047_A701.TIF CONSTRPLANS VIEW
048_A801.TIF CONSTRPLANS VIEW
049_A802.TIF CONSTRPLANS VIEW
050_A803.TIF CONSTRPLANS VIEW
051_A804.TIF CONSTRPLANS VIEW
052_A805.TIF CONSTRPLANS VIEW
053_A806.TIF CONSTRPLANS VIEW
054_A901.TIF CONSTRPLANS VIEW
055_A902.TIF CONSTRPLANS VIEW
056_A903.TIF CONSTRPLANS VIEW
057_M101.TIF CONSTRPLANS VIEW
058_M102.TIF CONSTRPLANS VIEW
059_M103.TIF CONSTRPLANS VIEW
060_M201.TIF CONSTRPLANS VIEW
061_M202.TIF CONSTRPLANS VIEW
062_M301.TIF CONSTRPLANS VIEW
063_M302.TIF CONSTRPLANS VIEW
064_M303.TIF CONSTRPLANS VIEW
065_M401.TIF CONSTRPLANS VIEW
066_P101.TIF CONSTRPLANS VIEW
067_P102.TIF CONSTRPLANS VIEW
068_P103.TIF CONSTRPLANS VIEW
069_P201.TIF CONSTRPLANS VIEW
070_P301.TIF CONSTRPLANS VIEW
071_E0.1.TIF CONSTRPLANS VIEW
072_E1.1.TIF CONSTRPLANS VIEW
073_E1.2.TIF CONSTRPLANS VIEW
074_E1.3.TIF CONSTRPLANS VIEW
075_E2.1.TIF CONSTRPLANS VIEW
076_E2.2.TIF CONSTRPLANS VIEW
077_E2.3.TIF CONSTRPLANS VIEW
078_E3.1.TIF CONSTRPLANS VIEW
079_E3.21.TIF CONSTRPLANS VIEW
080_E3.22.TIF CONSTRPLANS VIEW
081_E3.3.TIF CONSTRPLANS VIEW
082_E3.4.TIF CONSTRPLANS VIEW
083_E3.5.TIF CONSTRPLANS VIEW
084_E3.6.TIF CONSTRPLANS VIEW
085_E4.0.TIF CONSTRPLANS VIEW
086_E4.1.TIF CONSTRPLANS VIEW
087_E3.41.TIF CONSTRPLANS VIEW
088_E3.42.TIF CONSTRPLANS VIEW
089_E4.2.TIF CONSTRPLANS VIEW
090_E5.0.TIF CONSTRPLANS VIEW
091_E5.1.TIF CONSTRPLANS VIEW
092_E5.2.TIF CONSTRPLANS VIEW
093_E5.3.TIF CONSTRPLANS VIEW
094_ES01.TIF CONSTRPLANS VIEW
095_ES02.TIF CONSTRPLANS VIEW
096_ES03.TIF CONSTRPLANS VIEW
097_T2.1.TIF CONSTRPLANS VIEW
098_T2.2.TIF CONSTRPLANS VIEW
099_T2.3.TIF CONSTRPLANS VIEW
100_T2.4.TIF CONSTRPLANS VIEW
101_T2.5.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW