Permit: T10BU01834
Permit Details
Apply Date:
12/13/2010
Applicant:
GENE GOLDSTEIN
Description:
GRADING & SWPPP
Contractors:
- G 4 CONSTRUCTION MANAGEMENT LLC
Permit Reviews
Permit Number - T10BU01834
Permit Status: Final
Permit Description: GRADING & SWPPP
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/17/2011 | RESUBMITTAL - GRADING | 04/20/2011 | COMPLETED |
| 06/30/2011 | REVISION - GRADING | 07/01/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T10BU01834
Permit Status: Final
Permit Description: GRADING & SWPPP
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/13/2010 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T10BU01834
Permit Description: GRADING & SWPPP
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/22/2011 | ENGINEERING PRE-CONSTRUCTION | DROBERTS | Approved | LOOKED OVER THE SITE WORK HAPPENING AT THIS TIME AND THE WORK THAT IS PROJECTED FOR NEXT WEEK TO DETERMINE WHAT STORM CONTROLS NEED TO BE ADDRESSED. STORM CONTROLS HAVE BEEN PLACED ALONG THE PERIMETER AT THIS TIME TO PROJECT THE ADJACENT AREAS FROM RUNOFF. |
| 05/26/2011 | GRADING - REBAR | DROBERTS | Approved | |
| 07/13/2011 | RAINWATER - INTERMEDIATE | DROBERTS | Approved | |
| 07/15/2011 | STORMWATER INSTALL OF CONTROLS | DROBERTS | Approved | |
| 07/15/2011 | GRADING - TIER REV | DROBERTS | Approved | |
| 07/18/2011 | GRADING - INTERMEDIATE | DROBERTS | Approved | |
| 08/31/2011 | GRADING - CHECK FOR ACTIVITY | JLINVIL1 | Approved | Per D. Roberts. |
| 08/31/2011 | RAINWATER - FINAL | JLINVIL1 | Approved | Per D. Roberts |
| 08/31/2011 | STORMWATER FINAL INSPECTION | JLINVIL1 | Approved | Per D. Roberts |
| 08/31/2011 | STORMWATER FOLLOW-UP INSP | JLINVIL1 | Approved | Per D. Roberts |
| 08/31/2011 | GRADING - FINAL | JLINVIL1 | Approved | |
| 08/31/2011 | GRADING - FINAL | JLINVIL1 | Approved | 4 Tree plantings at the northern side of the phase 2 area can be deferred until PH. 2 is developed. See site plan. Striping and landscaping will occur in the future phase. |