Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Grading
Address:
2480 N SWAN RD
Apply Date:
02/10/2010
Applicant:
N/A
Description:
GRADING: CROSSROADS FESTIVAL
Contractors:
  • TRIUMPH BUILDERS SOUTHWEST LLC *C*

Permit Reviews

Permit Number - T10BU00260
Permit Status: Final
Permit Description: GRADING: CROSSROADS FESTIVAL
Start Date Submittal Complete Date Status  
09/01/2010 RESUBMITTAL - GRADING 09/15/2010 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T10BU00260
Permit Status: Final
Permit Description: GRADING: CROSSROADS FESTIVAL
Total Outstanding Activity Conditions - 1
Date Name
02/10/2010 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T10BU00260
Permit Description: GRADING: CROSSROADS FESTIVAL
Total Completed Inspections - 9
Date Description Inspector Results Comments
10/01/2010 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved PRECON INSPECTION WAS NEVER CALLED IN, CONSTRUCTION HAS ALREADY STARTED.
AN ACCESS AGREEMENT WAS MADE BETWEEN THE ADJACENT RESIDENTIAL PROPERTY AND FYR'S.
CONTRACTOR HAD QUESTIONS ABOUT HC RAMP TO BE INSTALLED. ENSURE RAMP MEETS ANSI/ADAAG.

ACCESS FROM NEIGHBORHOOD WILL NOT MEET ADAAG/ANSI DUE THE EXISTING SLOPE CONDITIONS. CONTRACTOR IS CONSTRUCTING ADAAG/ANSI COMPLIANT ACCESS FROM ROW.

NO STORM WATER CONCERS AT THIS SITE NO SWPPP REQ.
10/01/2010 GRADING - INTERMEDIATE MRUSSO Approved PRECON INSPECTION WAS NEVER CALLED IN, CONSTRUCTION HAS ALREADY STARTED.
AN ACCESS AGREEMENT WAS MADE BETWEEN THE ADJACENT RESIDENTIAL PROPERTY AND FYR'S.
CONTRACTOR HAD QUESTIONS ABOUT HC RAMP TO BE INSTALLED. ENSURE RAMP MEETS ANSI/ADAAG.

ACCESS FROM NEIGHBORHOOD WILL NOT MEET ADAAG/ANSI DUE THE EXISTING SLOPE CONDITIONS. CONTRACTO IS CONSTRUCTING ADAAG/ANSI COMPLIANT ACCESS FROM ROW.

NO STORM WATER CONCERS AT THIS SITE NO SWPPP REQ.
10/01/2010 STORMWATER FOLLOW-UP INSP MRUSSO Approved PRECON INSPECTION WAS NEVER CALLED IN, CONSTRUCTION HAS ALREADY STARTED.
AN ACCESS AGREEMENT WAS MADE BETWEEN THE ADJACENT RESIDENTIAL PROPERTY AND FYR'S.
CONTRACTOR HAD QUESTIONS ABOUT HC RAMP TO BE INSTALLED. ENSURE RAMP MEETS ANSI/ADAAG.

ACCESS FROM NEIGHBORHOOD WILL NOT MEET ADAAG/ANSI DUE THE EXISTING SLOPE CONDITIONS. CONTRACTO IS CONSTRUCTING ADAAG/ANSI COMPLIANT ACCESS FROM ROW.

NO STORM WATER CONCERS AT THIS SITE NO SWPPP REQ.
12/07/2010 GRADING - FINAL MRUSSO Approved INSPECTION CALLED IN FOR BLDG PERMITS T10CM00365/364, RESULTS WERE AS FOLLOWS:
1) PRIOR TO FINAL APPROVAL FOR C OF O FOR ENGINEERING, ENSURE GRADING PERMIT # T10BU00260 IS FINALED.
2) SITE PEDESTRIAN ACCESS FROM SWAN ROAD DOES NOT MEET ADAAC/ANSI - SLOPE >5%.
3) NEW HC PARKING ALONG SE CORNER OF GAS CANOPY DOES NOT MEET ADAAG/ANSI - SLOPES >2%.
4) NO INSPECTION BY ENGINEERING FOR INSTALLATION OF NEW STORM DRAIN PIPING INSTALLED - NEED TO HAVE ENG OF RECORD SIGN OFF OR EXCAVATE AND INSPECT PIPE.
01/31/2011 GRADING - TIER REV MRUSSO Approved CONTRACTOR HAS PROVIDED A CERTIFICATION STATEMENT FROM THE ENG OF RECORD AND AN AS-BUILT SHOWING CHANGES MADE.
FINAL APPROVAL NOT TO BE GIVEN UNTIL THE HC PARKING FOR THIS SITE IS RE-INSTALLED TO MEET ADAAG/ANSI REQUIREMENTS.
01/31/2011 LANDSCAPE INSPECTION MRUSSO Approved
02/02/2011 GRADING - CHECK FOR ACTIVITY MRUSSO Approved
03/10/2011 PERMIT FINALED KMEDINA Approved
06/13/2019 GRADING - REBAR RLEDONNE Approved

Documents

File Name Document Type  
None DOCUMENTS VIEW
2010_12_07 CERTIFICATION LETTER.PDF DOCUMENTS VIEW