Permit: T09CM03117
Permit Details
Apply Date:
11/25/2009
Applicant:
N/A
Description:
SOLAR WATER HEATER
Contractors:
- RUSSETT SERVICE CORPORATION, *C
Permit Reviews
Permit Number - T09CM03117
Permit Status: Final
Permit Description: SOLAR WATER HEATER
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/26/2010 | REVISION - - 1ST | 04/26/2010 | COMPLETED |
| 11/25/2009 | RESIDENTIAL BLDG/ZONING-WALKTHRU | 11/25/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09CM03117
Permit Status: Final
Permit Description: SOLAR WATER HEATER
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/25/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T09CM03117
Permit Description: SOLAR WATER HEATER
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2009 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) LEFT PETITION OF APPEAL ON SITE TO BE SIGNED 2) ALL TUBING TO BE SUPPORTED AT CORRECT INTERVALS, PROPERLY WITH FASTENERS THAT ACTUALLY HOLD INTO SURFACE 3) LOW VOLTAGE WIRING TO BE PROTECTED FROM DAMAGE 4) ALL ROOF TOP PIPING AND PANEL TO BE ELEVATED 1 1/2" MINIMUM FROM ROOF SURFACE 5) SHOULDN'T A DRAIN BACK SYSTEM GRVITY DRAIN BACK TO THE TANK ? 6) LABEL BREAKERS IN PANEL FOR NEW ELECTRIC WATER HEATER CIRCUIT 7) IN THE FUTURE HAVE ELECTRICAL INSPECTION ON PERMIT CARD FOR ALL NEW ELECTRICAL WORK |
| 12/16/2009 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
| 05/19/2010 | ELECTRIC - FINAL | RRICH | Approved | IVRS - Inspection :* |
| 05/20/2010 | PERMIT FINALED | JWEATHER | Approved |