Permit Details

Status:
Final
Type:
Grading
Apply Date:
07/08/2009
Applicant:
DCC COMPANY
Description:
GRADING:TPC @ GATEWAY CENTER
Contractors:
  • TRIUMPH BUILDERS SOUTHWEST LLC *C*

Permit Reviews

Permit Number - T09BU01001
Permit Status: Final
Permit Description: GRADING:TPC @ GATEWAY CENTER
Start Date Submittal Complete Date Status  
07/08/2009 GRADING 07/08/2009 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T09BU01001
Permit Status: Final
Permit Description: GRADING:TPC @ GATEWAY CENTER
Total Outstanding Activity Conditions - 1
Date Name
07/08/2009 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T09BU01001
Permit Description: GRADING:TPC @ GATEWAY CENTER
Total Completed Inspections - 7
Date Description Inspector Results Comments
07/16/2009 ENGINEERING PRE-CONSTRUCTION DROBERTS Approved PREVIOUSLY DONE WITH JOHN BRUCKMEIER WHEN THE SITE WORK WAS STARTED.
08/04/2009 GRADING - INTERMEDIATE DROBERTS Approved 1) SITE TO REMAIN AS A PARTIAL TILL ALL OF THE WORK ON THIS SITE IS COMPLETE. CONTRACTOR CONTINUES TO WORK WITH THE ENGINEER OF RECORD TO COMPLETE ALL MODIFICATIONS THAT HAVE BEEN MADE TO THE EXTERIOR DRAINAGE. 2) THE HANDICAP ACCESS IS BEING MODIFIED TO ALLOW FOR CLEAR FREE ACCESS TO THE HANDICAP ACCESS RAMP LOCATED AT THE SOUTH EAST CORNER OF THE BUILDING. THESE MODIFICATIONS WILL REQUIRE ADDITIONAL ASPHALT TO BE ADDED TO THE EXISTING PARKING LOT, WHICH WILL BE CHECKED PRIOR TO FINALING THE BUILDING COMBO PERMIT. THIS WORK IS SCHEDULED TO TAKE PLACE BY THE END OF THIS WEEK AND WILL BE RE-INSPECTED ONCE THE CONTRACTOR RECALLS THE INSPECTION. 3) A CERTIFICATION LETTER IS REQUIRED ONCE ALL OF THE SITE WORK IS DONE AS WELL AS A SET OF APPROVED AS-BUILT DRAWINGS BY ENGINEERING AND ZONING. ALL WORK WILL BE CHECKED ONCE IT HAS BEEN COMPLETED, ALL REMAINING ITEMS WILL BE SIGNED OFF AT THAT TIME IF IT IS COMPLETE.
08/04/2009 GRADING - CHECK FOR ACTIVITY DROBERTS Approved CONTRACTOR CONTINUES TO WORK ON MODIFICATIONS TO THE DRAINAGE AS DIRECTED BY THE ENGINEER OF RECORD. ALL WORK SHOULD BE COMPLETE BY THE END OF THE WEEK.
08/04/2009 GRADING - REBAR DROBERTS Approved NOT REQUIRED AT THIS TIME.
10/28/2009 GRADING - FINAL DROBERTS Approved
10/28/2009 GRADING - TIER REV DROBERTS Approved
02/09/2010 PERMIT FINALED KMEDINA Approved