Permit Details

Status:
Final
Type:
Grading and SWPPP
Apply Date:
04/17/2009
Applicant:
CANYON BUILDING AND DESIGN L L C - DAVID GEROAO **C
Description:
GRADING:ST AUGUSTINE HS MULTIPURPOSE BLD 3481CY CUT & 3864CY FILL
Contractors:
  • CANYON BUILDING AND DESIGN L L C **C

Permit Reviews

Permit Number - T09BU00571
Permit Status: Final
Permit Description: GRADING:ST AUGUSTINE HS MULTIPURPOSE BLD 3481CY CUT & 3864CY FILL
Start Date Submittal Complete Date Status  
03/16/2010 REVISION - GRADING 04/13/2010 ACTIVE Review Details
04/17/2009 PLANS OK TO SUBMIT - GRADING 04/17/2009 COMPLETED Review Details
04/17/2009 GRADING 05/04/2009 COMPLETED Review Details
04/17/2009 SWPPP 04/29/2009 COMPLETED Review Details
05/04/2009 GRADING 05/07/2009 COMPLETED Review Details
05/04/2009 SWPPP 05/04/2009 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T09BU00571
Permit Status: Final
Permit Description: GRADING:ST AUGUSTINE HS MULTIPURPOSE BLD 3481CY CUT & 3864CY FILL
Total Outstanding Activity Conditions - 1
Date Name
04/17/2009 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T09BU00571
Permit Description: GRADING:ST AUGUSTINE HS MULTIPURPOSE BLD 3481CY CUT & 3864CY FILL
Total Completed Inspections - 11
Date Description Inspector Results Comments
05/11/2009 STORMWATER INSTALL OF CONTROLS NKALAHAR Approved NO SWPPP WITH THIS GRADING PLAN-CONTROLS INSTALLED ON LOW SIDE OF SITE
05/11/2009 ENGINEERING PRE-CONSTRUCTION NKALAHAR Approved AP
MET WITH DAVID YOUNG AND LUIS VASQUEZ ON SITE

THERE WILL BE IMPORT TO THIS SITE FROM T06BU02506 VILLAS ESCALANTE 3755 S PRUDENCE
CONTRACTOR AWARE OF TRACK OUT/SWPPP CONCERNS
12/08/2009 GRADING - FINAL DROBERTS Approved THE FINAL FOR THIS SITE WILL NOT BE GIVEN UNTIL THE FOLLOWING ITEMS HAVE BEEN ADDRESSED:
1) PROVIDE AS-BUILT DRAWINGS NOTING ALL CHANGES THAT HEVE BEEN MADE ON THIS SITE THAT ARE NOT REFLECTED WITHIN THE CURRENT APPROVED SET OF PLANS.
2) THE DETENTION/RETENTION BASIN IS NOT ADEQUATELY RAINING PER THE PIMA COUNTY/CITY OF TUCSON RETENTION/DETENTION MANUAL. WATER WITHIN THE BASIN IS TO DRAIN WITHIN 12 HOURS OF THE LAST RAINFALL. STANDING WATER HAS BEEN NOTED IN THE BASIN AT 3:00 P.M. OM 12/08/09 AND AT 5:00 A.M. ON 12/09/09. HAVE THE ENGINEER ADDRESS WHAT IT WILL TAKE TO GET THIS BASIN INTO COMPLIANCE.
3) PROVIDE THIS OFFICE WITH A LETTER OF CERTIFICATION FROM THE ENGINEER OF RECORD FOR ALL WORK THAT HAS BEEN COMPLETED ON THIS SITE.
4) THE HANDICAP SIGNS HAVE NOT BEEN INSTALLED PER OUR STANDARD SPECIFICATIONS. ALL SIGNS NEED TO BE GROUND MOUNTED IN A CONCRETE FOOTER, AND NEED TO HAVE 84 INCHES OF CLEAR SPACE FROM THE BOTTOM OF THE MAIN SIGN TO THE FINISH DIRT GRADE.
12/08/2009 STORMWATER FINAL INSPECTION DROBERTS Approved
12/08/2009 STORMWATER FOLLOW-UP INSP DROBERTS Approved
12/08/2009 GRADING - INTERMEDIATE DROBERTS Approved
12/08/2009 GRADING - CHECK FOR ACTIVITY DROBERTS Approved
12/08/2009 GRADING - REBAR DROBERTS Approved
12/08/2009 GRADING - TIER REV DROBERTS Approved
12/09/2009 NPPO PRE PERMIT INSPECTION JLINVILLE Approved
12/09/2009 LANDSCAPE INSPECTION JLINVILLE Approved

Documents

File Name Document Type  
001_SP1 OF 6.TIF GRADING PLANS VIEW
002_SP2 OF 6.TIF GRADING PLANS VIEW
003_SP3 OF 6.TIF GRADING PLANS VIEW
004_SP3.TIF GRADING PLANS VIEW
004_SP4 OF 6.TIF GRADING PLANS VIEW
005_SP4.TIF GRADING PLANS VIEW
005_SP5 OF 6.TIF GRADING PLANS VIEW
006_SP6 OF 6.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW