Permit: T09BU00571
Permit Details
Apply Date:
04/17/2009
Applicant:
CANYON BUILDING AND DESIGN L L C - DAVID GEROAO **C
Description:
GRADING:ST AUGUSTINE HS MULTIPURPOSE BLD 3481CY CUT & 3864CY FILL
Contractors:
- CANYON BUILDING AND DESIGN L L C **C
Permit Reviews
Permit Number - T09BU00571
Permit Status: Final
Permit Description: GRADING:ST AUGUSTINE HS MULTIPURPOSE BLD 3481CY CUT & 3864CY FILL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/16/2010 | REVISION - GRADING | 04/13/2010 | ACTIVE |
04/17/2009 | PLANS OK TO SUBMIT - GRADING | 04/17/2009 | COMPLETED |
04/17/2009 | GRADING | 05/04/2009 | COMPLETED |
04/17/2009 | SWPPP | 04/29/2009 | COMPLETED |
05/04/2009 | GRADING | 05/07/2009 | COMPLETED |
05/04/2009 | SWPPP | 05/04/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09BU00571
Permit Status: Final
Permit Description: GRADING:ST AUGUSTINE HS MULTIPURPOSE BLD 3481CY CUT & 3864CY FILL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
04/17/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T09BU00571
Permit Description: GRADING:ST AUGUSTINE HS MULTIPURPOSE BLD 3481CY CUT & 3864CY FILL
Total Completed Inspections - 11
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/11/2009 | STORMWATER INSTALL OF CONTROLS | NKALAHAR | Approved | NO SWPPP WITH THIS GRADING PLAN-CONTROLS INSTALLED ON LOW SIDE OF SITE |
05/11/2009 | ENGINEERING PRE-CONSTRUCTION | NKALAHAR | Approved | AP MET WITH DAVID YOUNG AND LUIS VASQUEZ ON SITE THERE WILL BE IMPORT TO THIS SITE FROM T06BU02506 VILLAS ESCALANTE 3755 S PRUDENCE CONTRACTOR AWARE OF TRACK OUT/SWPPP CONCERNS |
12/08/2009 | GRADING - FINAL | DROBERTS | Approved | THE FINAL FOR THIS SITE WILL NOT BE GIVEN UNTIL THE FOLLOWING ITEMS HAVE BEEN ADDRESSED: 1) PROVIDE AS-BUILT DRAWINGS NOTING ALL CHANGES THAT HEVE BEEN MADE ON THIS SITE THAT ARE NOT REFLECTED WITHIN THE CURRENT APPROVED SET OF PLANS. 2) THE DETENTION/RETENTION BASIN IS NOT ADEQUATELY RAINING PER THE PIMA COUNTY/CITY OF TUCSON RETENTION/DETENTION MANUAL. WATER WITHIN THE BASIN IS TO DRAIN WITHIN 12 HOURS OF THE LAST RAINFALL. STANDING WATER HAS BEEN NOTED IN THE BASIN AT 3:00 P.M. OM 12/08/09 AND AT 5:00 A.M. ON 12/09/09. HAVE THE ENGINEER ADDRESS WHAT IT WILL TAKE TO GET THIS BASIN INTO COMPLIANCE. 3) PROVIDE THIS OFFICE WITH A LETTER OF CERTIFICATION FROM THE ENGINEER OF RECORD FOR ALL WORK THAT HAS BEEN COMPLETED ON THIS SITE. 4) THE HANDICAP SIGNS HAVE NOT BEEN INSTALLED PER OUR STANDARD SPECIFICATIONS. ALL SIGNS NEED TO BE GROUND MOUNTED IN A CONCRETE FOOTER, AND NEED TO HAVE 84 INCHES OF CLEAR SPACE FROM THE BOTTOM OF THE MAIN SIGN TO THE FINISH DIRT GRADE. |
12/08/2009 | STORMWATER FINAL INSPECTION | DROBERTS | Approved | |
12/08/2009 | STORMWATER FOLLOW-UP INSP | DROBERTS | Approved | |
12/08/2009 | GRADING - INTERMEDIATE | DROBERTS | Approved | |
12/08/2009 | GRADING - CHECK FOR ACTIVITY | DROBERTS | Approved | |
12/08/2009 | GRADING - REBAR | DROBERTS | Approved | |
12/08/2009 | GRADING - TIER REV | DROBERTS | Approved | |
12/09/2009 | NPPO PRE PERMIT INSPECTION | JLINVILLE | Approved | |
12/09/2009 | LANDSCAPE INSPECTION | JLINVILLE | Approved |