Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
In Revision
Type:
Development Package
Apply Date:
01/21/2009
Applicant:
Description:
GRADING: 3820 CY CUT 814CY FILL

Permit Reviews

Permit Number - T09BU00091
Permit Status: In revision
Permit Description: GRADING: 3820 CY CUT 814CY FILL
Start Date Submittal Complete Date Status  
01/20/2011 REVISION - GRADING 01/21/2011 COMPLETED Review Details
01/21/2009 PLANS OK TO SUBMIT - GRADING 01/21/2009 COMPLETED Review Details
02/02/2009 GRADING 03/03/2009 COMPLETED Review Details
03/23/2009 GRADING 04/09/2009 COMPLETED Review Details
04/22/2009 GRADING 12/15/2010 COMPLETED Review Details
12/15/2010 REVISION - GRADING 01/19/2011 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T09BU00091
Permit Status: In revision
Permit Description: GRADING: 3820 CY CUT 814CY FILL
Total Outstanding Activity Conditions - 3
Date Name
01/21/2009 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
02/11/2009 NPPO PRE PERMIT INSPECTION MUST BE PERFORMED PRIOR TO GRUBBING OR GRADING.
04/07/2009 Landscape / NPPO have conditionally approved the Grading Plan. The condition is that all engineering comments and concern are addressed prior the NPPO approval stamp.

Completed Inspections

Permit Status: In Revision
Permit Number: T09BU00091
Permit Description: GRADING: 3820 CY CUT 814CY FILL
Total Completed Inspections - 8
Date Description Inspector Results Comments
06/24/2010 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 06/24/2010; Status: Approved; Inspector: JFEMLING; Comment: Entered by JFEMLIN1 - Met with Kevin Cobos, Tofel const. 707-3923 discussed SWPPP and grading plans, also met with LS Arch. and discussed NPPO and trees to be saved, all have been flagged. Grading to start on 6/28}
01/05/2011 PDSD Site/Engineering Division - NPPO Passed {Activity date: 01/05/2011; Status: Approved; Inspector: ACONNOR; Comment: Entered by ACONNOR1 - }
07/07/2011 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/07/2011; Status: Approved; Inspector: LMakus; Comment: Entered by LMAKUS1 - }
07/07/2011 ENGR Engineering Final Passed {Activity date: 07/07/2011; Status: Approved; Inspector: LMakus; Comment: Entered by LMAKUS1 - } ; {Activity date: 03/08/2011; Status: Continued; Inspector: RDLD; Comment: Entered by RLEDONN1 - WORKING ON PUNCH LIST}
07/07/2011 SITE - Stormwater Follow-up Passed {Activity date: 07/07/2011; Status: Approved; Inspector: LMakus; Comment: Entered by LMAKUS1 - } ; {Activity date: 09/15/2010; Status: Continued; Inspector: MCARREON; Comment: Entered by MCARREO1 - CONSTRUCTION ENTRANCE NEEDS TO BE RESTABILIZED.}
07/07/2011 ENGR Grading Final Passed {Activity date: 07/07/2011; Status: Approved; Inspector: LMakus; Comment: Entered by LMAKUS1 - }
07/07/2011 SITE - Stormwater Final Inspection Passed {Activity date: 07/07/2011; Status: Approved; Inspector: LMakus; Comment: Entered by LMAKUS1 - }
07/28/2011 SITE - Stormwater Setup and Controls Passed {Activity date: 07/28/2011; Status: Approved; Inspector: JFEMLING; Comment: Entered by JFEMLIN1 - Approved} ; {Activity date: 10/04/2010; Status: Continued; Inspector: MCARREON; Comment: Entered by MCARREO1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 09/01/2010; Status: Continued; Inspector: MCARREON; Comment: Entered by MCARREO1 - STORMWATER CONTROLS ARE SUFFICIENT.} ; {Activity date: 08/16/2010; Status: Continued; Inspector: MCARREON; Comment: Entered by MCARREO1 - MET WITH KEVIN REGARDING EARLY HOURS REQUEST FOR SLAB POUR.} ; {Activity date: 08/02/2010; Status: Continued; Inspector: MCARREON; Comment: Entered by MCARREO1 - SPOKE WITH KEVIN REGARDING TRACKOUT ON LIBERTY AND IRVINGTON.} ; {Activity date: 07/01/2010; Status: Approved; Inspector: MCARREON; Comment: Entered by MCARREO1 - SPOKE WITH KEVIN COBOS(571-0101) JOB SUPER. TOFEL CONSTRUCTION. CONTROLS ARE IN AS IS THE STABILIZED CONST. ENTRANCE. STILL SOME TRACK-OUT ON LIBERTY AND YESTERDAY SOME ON IRVINGTON. ASKED HIM TO SWEEP THOSE AREAS THROUGH OUT THE DAY, ESPECIALLY AS THEY ARE HAULING DIRT.}

Documents

File Name Document Type  
None DOCUMENTS VIEW
NPPO REVISIONS 2011_02_08.PDF DOCUMENTS VIEW
BOND RELEASE LETTER 2011_07_28.PDF DOCUMENTS VIEW