Permit: T08CM03865
Permit Details
Apply Date:
12/11/2008
Applicant:
N/A
Description:
REMODEL HOUSE WOP/. INITIAL EVALUTION FEES ADDED
Permit Reviews
Permit Number - T08CM03865
Permit Status: Final
Permit Description: REMODEL HOUSE WOP/. INITIAL EVALUTION FEES ADDED
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/14/2009 | REVISION - - 1ST | 05/14/2009 | COMPLETED |
| 05/14/2009 | REVISION - - 1ST | 05/27/2009 | COMPLETED |
| 12/11/2008 | OTHER | 12/11/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08CM03865
Permit Status: Final
Permit Description: REMODEL HOUSE WOP/. INITIAL EVALUTION FEES ADDED
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/11/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T08CM03865
Permit Description: REMODEL HOUSE WOP/. INITIAL EVALUTION FEES ADDED
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2008 | BUILDING - PROGRESS | LHANLY | Approved | A) FUTURE PLAN REQUIREMENTS, IN ADDITION TO A NEW FLOOR PLAN PLEASE PROVIDE THE FOLLOWING; 1. NEW POST & BEAM BEARING STRUCTURES INSIDE 2. 1-LINE FOR ALL ELECTRIC & PANEL SCHEDULES 3. NEW PLUMBING ISOMETRIC 4. NEW GAS ISOMETRIC 5. HEATING AND COOLING PLAN FOLLOWING ARE CORRECTIONS REQUIRED FOUND DURING INITIAL EVALUATION BUT DO NOT REPRESENT A COMPLETE LIST FOR FINAL CODE COMPLIANCE. 1. PVC YARD WATER LINE MAY NOT BE ABOVE GRADE 2. ANTI-SIPHON DEVICES REQUIRED ON HOSE BIBBS 3. GAS PRESSURE TEST WILL BE REQUIRED 4. BARE PLUMBING MAY NOT BE EMBEDDED IN CONCRETE 5. ELECTRODE GROUNDING SYSTEM TO BE VERIFIED 6. NEW ELECTRIC MUST MEET CODE. NO HIDDEN SPLICES 7. REPLACE DAMAGED RAFTER. INSTALL BEAM AT KITCHEN 8. UNCOVER ELECTRIC IN WOOD FRAMING FOR INSPECTION 9. PROVIDE COMBUSTION AIR FOR WATER HEATER. 10. PROVIDE SMOKE DETECTORS PER CURRENT CODE. 11. USE 5/8" SHEETROCK FOR CEILING SPANS OVER 24". 12. INSULATION REQUIRED |
| 05/28/2009 | PLUMBING - ROUGH, SOIL | DQUINN | Approved | |
| 05/28/2009 | PLUMBING - GAS PRESSURE TEST | DQUINN | Approved | IVRS - Inspection :* |
| 05/28/2009 | PLUMBING - INTERMEDIATE | DQUINN | Approved | IVRS - Inspection :* |
| 06/02/2009 | EXCAVATION/LAYOUT REBAR & ZON | DQUINN | Approved | IVRS - Inspection :* |
| 06/18/2009 | ELECTRIC - INTERMEDIATE | DQUINN | Approved | IVRS - Inspection :* |
| 06/24/2009 | MECHANICAL - INTERMEDIATE | DQUINN | Approved | IVRS - Inspection :* |
| 07/02/2009 | ROOF NAILING | DQUINN | Approved | IVRS - Inspection :* |
| 11/03/2009 | MECHANICAL - FINAL | DQUINN | Approved | IVRS - Inspection :* |
| 11/03/2009 | PLUMBING - FINAL | DQUINN | Approved | IVRS - Inspection :* |
| 11/03/2009 | ELECTRIC - FINAL | DQUINN | Approved | IVRS - Inspection :* |
| 11/03/2009 | BUILDING - FINAL | DQUINN | Approved | IVRS - Inspection :* |
| 11/03/2009 | OUTDOOR LIGHTING FINAL | DQUINN | Approved | IVRS - Inspection :* |
| 11/03/2009 | SHEET ROCK NAILING | DQUINN | Approved | IVRS - Inspection :* |
| 11/03/2009 | FRAMING | DQUINN | Approved | IVRS - Inspection :* |
| 11/04/2009 | PERMIT FINALED | JWEATHER | Approved |