Permit Details

Status:
Final
Type:
COMMERCIAL ALTERATION
Apply Date:
10/01/2008
Applicant:
N/A
Description:
TI:MCDONALDS RESTAURANT REVISION 1: STEEL LENTEL ADDITION
Architects:
  • GOGLIA, FREDERICK J
Contractors:
  • DAMITIO CONSTRUCTION INC ,

Permit Reviews

Permit Number - T08CM03245
Permit Status: Final
Permit Description: TI:MCDONALDS RESTAURANT REVISION 1: STEEL LENTEL ADDITION
Start Date Submittal Complete Date Status  
10/01/2008 COMMERCIAL TI 10/01/2008 COMPLETED Review Details
10/01/2008 COMMERCIAL TI 10/22/2008 COMPLETED Review Details
10/22/2008 RESUBMITTAL 11/18/2008 COMPLETED Review Details
12/04/2008 REVISION - - 1ST 12/05/2008 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T08CM03245
Permit Status: Final
Permit Description: TI:MCDONALDS RESTAURANT REVISION 1: STEEL LENTEL ADDITION
Total Outstanding Activity Conditions - 1
Date Name
10/01/2008 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T08CM03245
Permit Description: TI:MCDONALDS RESTAURANT REVISION 1: STEEL LENTEL ADDITION
Total Completed Inspections - 21
Date Description Inspector Results Comments
12/16/2008 ELECTRIC - INTERMEDIATE DSANTACR Approved IVRS - Inspection :*
1. OK IN WALLS & COUNTER ROUGH
2. RECAL INSP. HAVE CONTR. REMOVE COVERS TO SES AT NEW PANEL TERMINATION AND NEW PANEL COVER.
12/16/2008 MECHANICAL - INTERMEDIATE MRAMBER Approved
12/16/2008 PLUMBING - INTERMEDIATE RLEDONNE Approved IVRS - Inspection :*
1. 03005 ROUGH SOIL -- PARTIAL APPROVAL
2. HAND SINK STUB UP THRU FLOOR (ONLY)
3. FLOOR SINK IN SELF-SERVE VENT IN 10' UP WALL TEST OK
12/16/2008 ROOF NAILING MHENSON Approved IVRS - Inspection :*
12/16/2008 MECHANICAL - FINAL MRAMBER Approved IVRS - Inspection :*
12/16/2008 ENGINEERING - FINAL MAVERY Approved Spoke to Dave site super. Contractor needs to complete all work and remove all debris, dumpsters, and mini moblies from site before final.
12/16/2008 NPPO - FINAL ACONNOR Approved N/A
12/16/2008 LANDSCAPE - FINAL ACONNOR Approved N/A
12/16/2008 SIGN - FINAL JYBARRA Approved
12/17/2008 PLUMBING - ROUGH, SOIL RRICH Approved IVRS - Inspection :*
WATER TEST NEW PIPING FROM BASEMENT CAPPED ON 3" BEFORE EXISTING 4" FOR ALL NEW HAND SINK & (2) FLOOR SINKS WITH REVENT FROM HAND SINK AND SERVING STATION IN LOBBY, REVENT TO SANTEE 1' PAST AND TO 10' AFF
ON 1 1/2" VENT FOR FLOOR SINK AT DRIVE THRU.

1. HAVE CONTRACTOR CHANGE FROM TRIUMPH TO DAMITIO AT 201 N STONE
2. PROVIDE REDLINE OF UPGRADES TO EXISTING DRAINAGE ON SITE
3. PROVIDE TEST ON ADDITIONAL PIPING AT VENT THRU ROOF SYSTEM WITH APPROVED ABOVE CEILING SUPPORT
4. LETTER GIVING OK FOR ABS IN PLACE OF PVC PER SPEC. IS REQUIRED
12/17/2008 SHEET ROCK NAILING AQUIROZ Approved IVRS - Inspection :*
12/17/2008 FRAMING AQUIROZ Approved IVRS - Inspection :*
12/17/2008 BUILDING ABOVE CEILING AQUIROZ Approved IVRS - Inspection :*
12/17/2008 PLUMBING - PROGRESS RRICH Approved IVRS - Inspection :*
12/17/2008 RIGHT OF WAY - FINAL LLOPEZ Approved
02/13/2009 ELECTRIC - FINAL RMORENO Approved IVRS - Inspection :*
CHECKED PANEL OK
02/13/2009 ELECTRIC - ABOVE CEILING DSANTACR Approved
02/19/2009 FIRE - FINAL LTHOMAS Approved
04/17/2009 PLUMBING - FINAL RLEDONNE Approved IVRS - Inspection :*
04/17/2009 BUILDING - FINAL RLEDONNE Approved IVRS - Inspection :*
04/20/2009 PERMIT FINALED BFLORES Approved

Documents

File Name Document Type  
001__T100.TIF CONSTRPLANS VIEW
002__A100.TIF CONSTRPLANS VIEW
003__A200.TIF CONSTRPLANS VIEW
004__P100.TIF CONSTRPLANS VIEW
005__P200.TIF CONSTRPLANS VIEW
006__P300.TIF CONSTRPLANS VIEW
007__E100.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW