Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
DUPLEX NEW
Address NEW:
642 E LESTER ST #01
Apply Date:
06/25/2008
Applicant:
N/A
Description:
DUPLEX:LEST001500 T08-M0066
Architects:
  • GEORGE E. HOLGUIN
Contractors:
  • DESERT IMAGES

Permit Reviews

Permit Number - T08CM02248
Permit Status: C of o
Permit Description: DUPLEX:LEST001500 T08-M0066
Start Date Submittal Complete Date Status  
06/25/2008 RESIDENTIAL BLDG-MODEL PLAN/ENGINE/WALK THRU 06/25/2008 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T08CM02248
Permit Status: C of o
Permit Description: DUPLEX:LEST001500 T08-M0066
Total Outstanding Activity Conditions - 1
Date Name
06/25/2008 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T08CM02248
Permit Description: DUPLEX:LEST001500 T08-M0066
Total Completed Inspections - 26
Date Description Inspector Results Comments
07/08/2008 EXCAVATION/LAYOUT REBAR & ZON CRUIZ Approved IVRS - Inspection :*
OK TO POUR MAIN FOOTERS
DRAWINGS SHOWING A PORCH ON EAST END - NOT READY AT THIS TIME
07/08/2008 ELECTRIC - UFER CRUIZ Approved IVRS - Inspection :*
07/15/2008 STEM WALL/RETAINING WALL DQUINN Approved IVRS - Inspection :*
07/30/2008 PLUMBING - ROUGH, SOIL CRUIZ Approved IVRS - Inspection :*
08/07/2008 PLUMBING - PRE SLAB CRUIZ Approved IVRS - Inspection :*
08/07/2008 BUILDING PRE-SLAB CRUIZ Approved IVRS - Inspection :*
09/11/2008 EXT METAL CLIPS/EXT SHEATHING CRUIZ Approved IVRS - Inspection :*
1) INSPECTED ROOF NAILING AND EXT. METAL CLIP-OK TO DRY ROOF IN AND PROCEED
2) GETTING READY FOR STUCCO MESH
3) JUST WAITING ON APPROVED CHANGE FROM TRUSS 1 JOIST ON ROOF FRAMING PLAN. PROCEED AT YOUR OWN RISK
09/11/2008 ROOF NAILING CRUIZ Approved IVRS - Inspection :*
09/26/2008 PLUMBING - YARD WTR LINE/TEST CRUIZ Approved IVRS - Inspection :*
09/30/2008 PLUMBING - SEWER HCS CONNECT CRUIZ Approved IVRS - Inspection :*
10/02/2008 PLUMBING - INTERMEDIATE CRUIZ Approved IVRS - Inspection :*
10/21/2008 FRAMING CRUIZ Approved IVRS - Inspection :
See detailed listing on site.| 999*
1) BLK RETURN 2ND FLOOR BEDROOM 3 SIDES
2) BATHROOM EXHAUST-HALLWAY NEEDS TO BE SECURED IN ROOF JACK
3) STUCCO NOT COMPLETED ON 2ND FLOOR DECK
4) NEED TO STAPLE WIRE TO MISSED STUDS THROUGHOUT
5) MISSING BLK FOR TUB-SHOWER ENCLOSURE FOR BOTH BATHROOMS
6) A/C THERMOSTAT WIRE ENCASED IN FLEX CONDUIT, NEEDS TO BE SECURED IN CEILING 2ND FLOOR
7) MECHANICAL DUCT VENT MASTER BEDROOM BLK 3 SIDES 1ST FLOOR
10/21/2008 PLUMBING - GAS PRESSURE TEST CRUIZ Approved IVRS - Inspection :
See detailed listing on site.| 999*
10/21/2008 ELECTRIC - INTERMEDIATE CRUIZ Approved IVRS - Inspection :
See detailed listing on site.| 999*
10/29/2008 STUCCO MESH RFREIDIN Approved IVRS - Inspection :*
11/21/2008 MECHANICAL - INTERMEDIATE CRUIZ Approved IVRS - Inspection :*
11/25/2008 ELECTRIC - TEMPORARY SERVICE CRUIZ Approved
11/25/2008 SHEET ROCK NAILING CRUIZ Approved IVRS - Inspection :*
11/25/2008 ELECTRIC - CABLE DROP CRUIZ Approved IVRS - Inspection :*
11/25/2008 ELECTRIC - UNDERGROUND CRUIZ Approved IVRS - Inspection :*
11/26/2008 TEP CLEARANCE - AM JWEATHER Approved ECO CLEARED FOR #1 & 2 PER C. RUIZ
03/12/2009 MECHANICAL - FINAL CRUIZ Approved IVRS - Inspection :*
03/12/2009 PLUMBING - FINAL CRUIZ Approved IVRS - Inspection :*
03/12/2009 ELECTRIC - FINAL CRUIZ Approved IVRS - Inspection :*
03/12/2009 BUILDING - FINAL CRUIZ Approved IVRS - Inspection :*
03/13/2009 PERMIT FINALED JWEATHER Approved

Documents

File Name Document Type  
C OF O_04-02-2009.TIF CERT OF OCC VIEW
001__T1.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW