Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T08CM01638
Permit Details
Apply Date:
05/20/2008
Applicant:
PULTE HOME CORP AZ *C
Description:
NEW SFR PULT4535-2 T07-M0135
Contractors:
- PULTE HOME CORP AZ *C
Outstanding Activity Conditions
Permit Number - T08CM01638
Permit Status: Withdrwn
Permit Description: NEW SFR PULT4535-2 T07-M0135
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
05/20/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
05/20/2008 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
05/20/2008 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
05/20/2008 | SPECIAL INSPECTION IS REQUIRED FOR EXCAVATION PER U.A.C. SECTION 306. |
05/20/2008 | SPECIAL INSPECTION IS REQUIRED FOR POST TENSION PER U.A.C. SECTION 306. |
Outstanding Inspections
Permit Status: Withdrwn
Permit Number: T08CM01638
Permite Description: NEW SFR PULT4535-2 T07-M0135
Total Outstanding Inspections - 26
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
EXCAVATION/LAYOUT REBAR & ZON | N/A | Not Inspected | ||
BUILDING PRE-SLAB | N/A | Not Inspected | ||
EXT METAL CLIPS/EXT SHEATHING | N/A | Not Inspected | ||
ROOF NAILING | N/A | Not Inspected | ||
FRAMING | N/A | Not Inspected | ||
STUCCO MESH | N/A | Not Inspected | ||
U VALUE FOR WINDOW | N/A | Not Inspected | ||
SHEET ROCK NAILING | N/A | Not Inspected | ||
BUILDING - FINAL | N/A | Not Inspected | ||
ELECTRIC - UFER | N/A | Not Inspected | ||
ELECTRIC - UNDERGROUND | N/A | Not Inspected | ||
ELECTRIC - INTERMEDIATE | N/A | Not Inspected | ||
ELECTRIC - CABLE DROP | N/A | Not Inspected | ||
ELECTRIC - FINAL | N/A | Not Inspected | ||
PLUMBING - ROUGH, SOIL | N/A | Not Inspected | ||
PLUMBING - PRE SLAB | N/A | Not Inspected | ||
PLUMBING - INTERMEDIATE | N/A | Not Inspected | ||
PLUMBING - YARD WTR LINE/TEST | N/A | Not Inspected | ||
PLUMBING - GAS PRESSURE TEST | N/A | Not Inspected | ||
PLUMBING - GAS PRESS TEST FNL | N/A | Not Inspected | ||
PLUMBING - SEWER HCS CONNECT | N/A | Not Inspected | ||
SITE - SEWER | N/A | Not Inspected | ||
PLUMBING - FINAL | N/A | Not Inspected | ||
MECHANICAL - INTERMEDIATE | N/A | Not Inspected | ||
MECHANICAL - FINAL | N/A | Not Inspected | ||
FIRE SPKLR - FINAL | N/A | Not Inspected |