Permit: T08BU02179
Permit Details
Status:
Denied
Type:
COMMERCIAL OTHER
Address:
8174 S CAMINO DE CAFE
Address NEW:
8174 S CAMINO DE CAFE
Apply Date:
12/19/2008
Applicant:
PHYSICAL RESOURCE ENGINEERING INC
Description:
GRADING FOR NEW WAREHOUSE
Contractors:
- SIERRA LAND SURVEYING AND DEVELO
Permit Reviews
Permit Number - T08BU02179
Permit Status: Denied
Permit Description: GRADING FOR NEW WAREHOUSE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/09/2009 | RESUBMITTAL - GRADING ALL | 04/29/2009 | COMPLETED |
| 03/18/2010 | REVISION - GRADING | 04/15/2010 | COMPLETED |
| 12/19/2008 | PLANS OK TO SUBMIT - GRADING | 12/19/2008 | COMPLETED |
| 12/19/2008 | GRADING | 02/09/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08BU02179
Permit Status: Denied
Permit Description: GRADING FOR NEW WAREHOUSE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/19/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Denied
Permit Number: T08BU02179
Permite Description: GRADING FOR NEW WAREHOUSE
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| LANDSCAPE INSPECTION | N/A | Not Inspected | ||
| GRADING - REBAR | N/A | Not Inspected | ||
| GRADING - CHECK FOR ACTIVITY | N/A | Not Inspected | ||
| GRADING - INTERMEDIATE | N/A | Not Inspected | ||
| 12/14/2010 | GRADING - FINAL | N/A | Denied | SITE IS 50% COMPLETE, BUT IS NOT PER THE APPROVED PLANS. THE DEVELOPER IS WORKING ON REVISING THE DRAWINGS TO REFLECT WHAT HAS BEEN CONSTRUCTED IN THE FIELD. A FINAL INSPECTION WILL NOT BE PERFORMED UNTIL THE REVISED DRAWINGS HAVE BEEN APPROVED BY BOTH THE ZONING AND ENGINEERING DEPARTMENTS. |
| 12/15/2010 | STORMWATER FOLLOW-UP INSP | N/A | Continued | NO CONCERNS AT THIS TIME. |
Completed Inspections
Permit Status: Denied
Permit Number: T08BU02179
Permit Description: GRADING FOR NEW WAREHOUSE
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2009 | ENGINEERING PRE-CONSTRUCTION | DROBERTS | Approved | MET ONSITE WITH DEVELOPER TO LOOK AT THE WORK THAT WILL BE TAKING PLACE IN THIS AREA OVER THE NEXT MONTH. THIS SITE WILL BE MODERATELY GRADED DURING THE FIRST PHASES OF CONSTRUCTION TO REDUCE OVERALL WORK. THEY WILL CLEAR AND GRUBB ONLY THE AREAS THAT WILL BE AFFECTED BY THE CONSTRUCTION OF BUILDING FOOTERS AT THIS TIME, ALL OTHER AREAS WILL BE OPENNED AS NEEDED. A CONSTRUCTION ENTRANCE TO THE SITE WILL BE PROVIDED ONCE THEY HAVE STARTED PERFORMING THE CLEARING AND GRUBBING OPERATION. THE DEVELOPER HAS BEEN ADVISED OF THE CURRENT STORMWATER CONDITIONS THAT WILL BE ADHERED TO EVEN THOUGH THE SITE IS SMALLER THAN 1 ACRE. THEY WILL ENSURE THAT THEY MAINTAIN ALL TRACK OUT FROM THE SITE AND WILL REFRESH ALL SAND BAGS AT THE DRAINAGE INLET STRUCTURES AS NEEDED. DURING CONSTRUCTION THEY WILL MONITOR THE LOCAL DRAINAGE CHANNELS TO MAKE SURE THAT THEY DO NOT CAUSE ANY DAMAGE OR PLACE ANY MATERIALS INTO THE CHANNELS. |
| 07/07/2009 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved |