Permit: T08BU01943
Permit Details
Apply Date:
10/31/2008
Applicant:
MARC FROST
Description:
GRADING:CUT 8CU FILL 0
Permit Reviews
Permit Number - T08BU01943
Permit Status: Final
Permit Description: GRADING:CUT 8CU FILL 0
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/31/2008 | GRADING | 10/31/2008 | ACTIVE |
Outstanding Activity Conditions
Permit Number - T08BU01943
Permit Status: Final
Permit Description: GRADING:CUT 8CU FILL 0
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/31/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T08BU01943
Permit Description: GRADING:CUT 8CU FILL 0
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2009 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | DESERT CONCRETE CONSTRUCTION (GENERAL CONTRACTOR), BRUCE SCHNEIDER - SUPER 907-1086 1) KEEP DISTURDBED SOIL FROM CONSTRUCTION ON SITE. 2) SWEEP UP TRACKING OFF OF PUBLIC ROADWAYS AS NEEDED. 3) PROTECT ANY EXISTING STORM DRAINS/CATCH BASINS ON SITE. CALL FOR ANY CHANGES AND/OR QUESTIONS |
| 12/22/2009 | GRADING - FINAL | MRUSSO | Approved | SITE HAS BEEN PAVED AND CURBING HAS BEEN INSTALLED. SITE MUST BE STRIPED, ALL ACCESS WAYS AND LANDSCAPING MUST BE COMPLETED PRIOR TO FINAL APPROVAL. |
| 12/22/2009 | GRADING - INTERMEDIATE | MRUSSO | Approved | SITE HAS BEEN PAVED AND CURBING HAS BEEN INSTALLED. SITE MUST BE STRIPED, ALL ACCESS WAYS AND LANDSCAPING MUST BE COMPLETED PRIOR TO FINAL APPROVAL. |
| 12/22/2009 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | SITE IS STABILIZED AND PAVED PER PLAN. |
| 01/21/2010 | GRADING - CHECK FOR ACTIVITY | MRUSSO | Approved |