Permit Details

Status:
Expired
Type:
COMMERCIAL OTHER
Apply Date:
08/31/2007
Applicant:
E E C- ANDIE HASLEM
Description:
FLOODPLAIN USE PERMIT:GRADING

Permit Reviews

Permit Number - T07OT01974
Permit Status: Expired
Permit Description: FLOODPLAIN USE PERMIT:GRADING
Start Date Submittal Complete Date Status  
01/08/2008 FLOODPLAIN 01/08/2008 COMPLETED Review Details
08/31/2007 PLANS OK TO SUBMIT - FLOODPLAIN 08/31/2007 COMPLETED Review Details
09/06/2007 FLOODPLAIN 11/28/2007 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T07OT01974
Permit Status: Expired
Permit Description: FLOODPLAIN USE PERMIT:GRADING
Total Outstanding Activity Conditions - 18
Date Name
10/26/2007 The following 17 conditions apply to permit T07OT01974: 1) Call for Pre-construction meeting, elevation certification inspections, and final inspections. For a DSD Engineering Inspection, call IVR (740-6970), or contact DSD Engineering at 837-4991, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html
10/26/2007 2) Within 5 (five) days of issuance of this permit, and through completion of the project, notification must be posted and maintained in a conspicuous place on the job site stating "CONSTRUCTION PROCEEDING UNDER REQUIREMENTS OF CITY OF TUCSON FLOODPLAIN USE PERMIT # T07OT01974. FOR INFORMATION PLEASE CALL 791-5550."
10/26/2007 3) This permit becomes invalid and is subject to additional floodplain review, if any required development permit changes the configuration of the improvement, or, if there is any further disturbance within the floodplain other than that outlined in this application. This floodplain use permit may be subject to conditions or restrictions designed to reduce or mitigate the potential damage or hazard to life or property resulting from development within the regulatory floodplain, floodway or erosion hazard areas as determined by the project engineer and accepted by the City of Tucson.
10/26/2007 4) Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties.
10/26/2007 5) All work shall conform to the approved Grading Plan for TEP El Camino Del Cerro Substation sheets 1-4, sealed by Bruce Wilson, PE (10-23-07), which is made part of this permit.
10/26/2007 6) See the associated activity T07BU01857.
10/26/2007 7) All electrical, pump, or other service equipment shall be elevated at or above the regulatory flood elevation (2 feet above existing natural grade).
10/26/2007 8) Certification of elevation must be prepared by a state registered land surveyor (RLS) and submitted to the Development Services Department Engineering Division, after the service equipment is installed, prior to final inspection for permit T07BU01857. A copy of the partially filled out elevation certificate is on file at DSD until the completed elevation certificate is returned.
10/26/2007 9) The elevation certificate shall be prepared for the lowest equipment with relation to the adjacent grade of that specific piece of service equipment.
10/26/2007 10) An inspection is required prior to completion of any equipment requiring elevation certification to assure that sufficient fill / elevation is provided to bring the service equipment at or above the regulatory flood elevation, which is a minimum of 2 feet above the adjacent existing ground per the approved Drainage Report.
10/26/2007 11) Contractor will need to call for final inspection to permit T07BU01857 once elevation certificate has been completed by RLS for inspections by Development Services Department Engineering Division Inspection Team (791-5550 or 837-4888) after the installation of the service equipment, and prior to final acceptance by DSD Inspector.
10/26/2007 12) This Floodplain Use Permit and plans shall be kept in a readily accessible location on site at all times.
10/26/2007 13) Any additional future disturbance of the floodplain shall have separate floodplain use permit applications submitted to this office for review and approval.
10/26/2007 14) Additional Disturbance area is permitted at south entrance to the site for SWPPP purposes as shown on the SWPPP dated 10-25-07, for wash off area, temporary chemical storage area, and temporary refuse area only.
10/26/2007 15) Wash off area, temporary chemical storage area, and temporary refuse area shall have interim stormwater controls installed along downstream side of these areas.
10/26/2007 16) There shall be no other stockpiling material, or storage of vehicles, other than that which is accepted by COT and as shown on the approved permits and plans.
10/26/2007 17) Grouted Riprap at northeast corner of project shall be extended to 100-yr Floodplain Limits along 3:1(H:V) fill slope.
01/08/2008 Revision: wall openings extended. See revised grading plan approved 8JAN08. All previous conditions of T07BU01857 and T07OT01974 apply.

Documents

File Name Document Type  
001_FINAL ELEVATION CERT.TIF ELEVATION CERT VIEW
002_FINAL ELEVATION CERT ELEVATION CERT VIEW
003_FINAL ELEVATION CERT ELEVATION CERT VIEW
004_FINAL ELEVATION CERT ELEVATION CERT VIEW
None DOCUMENTS VIEW