Permit: T07CM04660
Permit Details
Apply Date:
12/12/2007
Applicant:
METRO PERMIT EXPRESS, INC *C
Description:
NEW METAL SHELL BUILDING
Contractors:
- SIERRA LAND SURVEYING AND DEVELO
Permit Reviews
Permit Number - T07CM04660
Permit Status: Final
Permit Description: NEW METAL SHELL BUILDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/03/2008 | POST 3RD PARTY REVIEW | 01/10/2008 | COMPLETED |
| 12/12/2007 | PLANS OK TO SUBMIT - 3RD PARTY | 12/12/2007 | COMPLETED |
| 12/12/2007 | 3RD PARTY REVIEW-COMMERCIAL | 01/03/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07CM04660
Permit Status: Final
Permit Description: NEW METAL SHELL BUILDING
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/12/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T07CM04660
Permit Description: NEW METAL SHELL BUILDING
Total Completed Inspections - 26
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2008 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* BACKWATER VALVE IS REQUIRED FOR LASER SURVEY REDLINE ON APPROVED PLAN |
| 06/05/2008 | PLUMBING - PRE SLAB | RRICH | Approved | IVRS - Inspection :* |
| 06/10/2008 | BUILDING PRE-SLAB | GDABBS | Approved | IVRS - Inspection :* VIEWED UFER AND PLUMBING PIPE WRAP |
| 06/11/2008 | PLUMBING - SEWER HCS CONNECT | RRICH | Approved | IVRS - Inspection :* WATER TEST FROM BLD. TO EXISTING HCS STUB OK |
| 06/11/2008 | SITE - SEWER | RRICH | Approved | IVRS - Inspection :* |
| 06/11/2008 | ELECTRIC - UFER | RJIROUDE | Approved | IVRS - Inspection :* |
| 07/15/2008 | SHEET ROCK NAILING | GDABBS | Approved | IVRS - Inspection :* WEST WALL FIRE TAPE OK |
| 12/30/2008 | EXT METAL CLIPS/EXT SHEATHING | GDABBS | Approved | IVRS - Inspection :* |
| 07/07/2009 | ELECTRIC - CABLE DROP | RJIROUDE | Approved | IVRS - Inspection :* 1) OK GROUND RODS |
| 08/19/2009 | EXCAVATION/LAYOUT REBAR & ZON | GDABBS | Approved | IVRS - Inspection :* 1) FOOTING FOR TRASH ENCLOSURE |
| 08/19/2009 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* |
| 12/04/2009 | FRAMING | GDABBS | Approved | IVRS - Inspection :* |
| 11/09/2010 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* |
| 03/22/2011 | RIGHT OF WAY - FINAL | MCASTRO | Approved | |
| 03/22/2011 | NPPO - FINAL | DROBERTS | Approved | THIS SITE HAS BEEN CHECKED FOR THE FULL RELEASE OF THE BUILDING SHELL. THIS IS APPROVED AT THIS TIME FOR THE SHELL BUILDING ONLY, AND ITEMS THAT ARE NOT COMEPLETE AT THIS TIME WILL BE HELD TO THE COMBO PERMIT AND WILL BE RE-INSPECTED ONCE ALL WORK HAS BEEN COMPLETED. MISSING LANDSCAPING, AND ENGINEERING ASPECTS NOT COMPLETE AT THIS TIME. |
| 03/22/2011 | LANDSCAPE - FINAL | DROBERTS | Approved | THIS SITE HAS BEEN CHECKED FOR THE FULL RELEASE OF THE BUILDING SHELL. THIS IS APPROVED AT THIS TIME FOR THE SHELL BUILDING ONLY, AND ITEMS THAT ARE NOT COMEPLETE AT THIS TIME WILL BE HELD TO THE COMBO PERMIT AND WILL BE RE-INSPECTED ONCE ALL WORK HAS BEEN COMPLETED. MISSING LANDSCAPING, AND ENGINEERING ASPECTS NOT COMPLETE AT THIS TIME. |
| 03/22/2011 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* |
| 03/22/2011 | ELECTRIC - TEMP POWER FOR TEST | RMORENO | Approved | IVRS - Inspection :* |
| 03/31/2011 | FIRE - FINAL | DRamirez | Approved | Approved 3/31/11 |
| 03/31/2011 | SIGN - FINAL | GDABBS | Approved | IVRS - Inspection :* |
| 03/31/2011 | BUILDING - FINAL | GDABBS | Approved | IVRS - Inspection :* |
| 03/31/2011 | U VALUE FOR WINDOW | GDABBS | Approved | IVRS - Inspection :* |
| 03/31/2011 | ROOF NAILING | GDABBS | Approved | IVRS - Inspection :* |
| 03/31/2011 | ELECTRIC - FINAL | RMORENO | Approved | IVRS - Inspection :* |
| 03/31/2011 | ELECTRIC - INTERMEDIATE | RMORENO | Approved | IVRS - Inspection :* |
| 04/01/2011 | ENGINEERING - FINAL | LHANLY | Approved | THIS SITE HAS BEEN CHECKED FOR THE FULL RELEASE OF THE BUILDING SHELL. THIS IS APPROVED AT THIS TIME FOR THE SHELL BUILDING ONLY, AND ITEMS THAT ARE NOT COMEPLETE AT THIS TIME WILL BE HELD TO THE COMBO PERMIT AND WILL BE RE-INSPECTED ONCE ALL WORK HAS BEEN COMPLETED. MISSING LANDSCAPING, AND ENGINEERING ASPECTS NOT COMPLETE AT THIS TIME. |