Permit: T07CM03553
Permit Details
Apply Date:
08/28/2007
Applicant:
FAST PERMITS
Description:
NEW DUPLEX
Permit Reviews
Permit Number - T07CM03553
Permit Status: Withdrwn
Permit Description: NEW DUPLEX
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/31/2008 | POST 3RD PARTY REVIEW | 02/07/2008 | COMPLETED |
02/07/2008 | RESUBMITTAL | 02/15/2008 | COMPLETED |
07/08/2008 | RESUBMITTAL | 07/21/2008 | ACTIVE |
08/28/2007 | PLANS OK TO SUBMIT - COMM | 08/29/2007 | COMPLETED |
08/30/2007 | 3RD PARTY REVIEW-RESIDENTIAL | 01/31/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07CM03553
Permit Status: Withdrwn
Permit Description: NEW DUPLEX
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
08/28/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
01/31/2008 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. |
01/31/2008 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
01/31/2008 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
02/07/2008 | SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE. THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. |
02/01/2008 | ELEVATION CERT FOR FINISHED FLOOR PRIOR TO 1015 |
Outstanding Inspections
Permit Status: Withdrwn
Permit Number: T07CM03553
Permite Description: NEW DUPLEX
Total Outstanding Inspections - 29
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
EXCAVATION/LAYOUT REBAR & ZON | N/A | Not Inspected | ||
STEM WALL/RETAINING WALL | N/A | Not Inspected | ||
BUILDING PRE-SLAB | N/A | Not Inspected | ||
REINFORCED MASONRY PRE-GROUT | N/A | Not Inspected | ||
EXT METAL CLIPS/EXT SHEATHING | N/A | Not Inspected | ||
ROOF NAILING | N/A | Not Inspected | ||
FRAMING | N/A | Not Inspected | ||
STUCCO MESH | N/A | Not Inspected | ||
U VALUE FOR WINDOW | N/A | Not Inspected | ||
SHEET ROCK NAILING | N/A | Not Inspected | ||
BUILDING - PROGRESS | N/A | Not Inspected | ||
BUILDING - FINAL | N/A | Not Inspected | ||
ELECTRIC - UFER | N/A | Not Inspected | ||
ELECTRIC - UNDERGROUND | N/A | Not Inspected | ||
ELECTRIC - INTERMEDIATE | N/A | Not Inspected | ||
ELECTRIC - TEMPORARY SERVICE | N/A | Not Inspected | ||
ELECTRIC - PROGRESS | N/A | Not Inspected | ||
ELECTRIC - FINAL | N/A | Not Inspected | ||
PLUMBING - ROUGH, SOIL | N/A | Not Inspected | ||
PLUMBING - PRE SLAB | N/A | Not Inspected | ||
PLUMBING - INTERMEDIATE | N/A | Not Inspected | ||
PLUMBING - YARD WTR LINE/TEST | N/A | Not Inspected | ||
PLUMBING - GAS PRESSURE TEST | N/A | Not Inspected | ||
PLUMBING - GAS PRESS TEST FNL | N/A | Not Inspected | ||
SITE - SEWER | N/A | Not Inspected | ||
PLUMBING - FINAL | N/A | Not Inspected | ||
MECHANICAL - UNDERGROUND | N/A | Not Inspected | ||
MECHANICAL - INTERMEDIATE | N/A | Not Inspected | ||
MECHANICAL - FINAL | N/A | Not Inspected |