Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T07CM02571
Permit Details
Apply Date:
06/19/2007
Applicant:
SAUL GARCIA
Description:
ADDT: 2 BEDRMS, LIVING RM AND PORCH
Permit Reviews
Permit Number - T07CM02571
Permit Status: Expired
Permit Description: ADDT: 2 BEDRMS, LIVING RM AND PORCH
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/19/2007 | RESIDENTIAL BLDG/ZONING-WALKTHRU | 09/12/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07CM02571
Permit Status: Expired
Permit Description: ADDT: 2 BEDRMS, LIVING RM AND PORCH
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/19/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T07CM02571
Permite Description: ADDT: 2 BEDRMS, LIVING RM AND PORCH
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/05/2008 | BUILDING PRE-SLAB | N/A | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED MORE INFO 2) FROM PLANS NO FRAMING, SLAB PLANS ? NO SLAB 3) SEVERAL VIOLATIONS NOTICED & EXPLAINED TO OWNER AT SITE 4) NO PLUMBING PLANS 5) ADVISED OWNER TO CALL SUPERVISOR RAY MAJUTA 6) ADDITION HAS BEEN CONNECTED TO EXISTING MOBILE HOME |
02/05/2008 | FRAMING | N/A | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
02/05/2008 | ELECTRIC - INTERMEDIATE | N/A | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
02/05/2008 | ELECTRIC - SERVICE RELOCATION | N/A | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
02/20/2008 | BUILDING - FINAL | N/A | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE 2 COMPLETE SET OF DRAWINGS TO D.S.D. FOR APPROVAL 2) EXISTING MOBILE HOME SHALL NOT SUPPORT ANY STRUCTURE 3) FOUNDATION REQUIRED ON ADDITIONS TO M/H 4) CROSS SECTIONAL DETAIL OF ALL STRUCTURES OTHER THAN M/H 5) ROOF AND FLOOR FRAMING PLANS OF ADDITIONS 6) DETAILS OF REPAIRS TO BE MADE TO EXISTING M/H ON PORTION OF WALL ALTERED/REMOVED 7) PLUMBING PLAN SEWER, WASTE AND WATER DISTRIBUTION 8) HAVE LICENSE ELECTRICIAN VERIFY ALL ELECTRICAL IS SAFE 9) CHECK WITH D.S.D. PLAN CHECK TO SEE IF ADDTIONS WILL BE ALLOWED UNDER MINIMUM HOUSING CODE IF SO HAVE D.N.R. INSPECT 10) YOU HAVE 30 DAYS TO OBTAIN ADDITION PERMITS AND HAVE A COMPLETE SET OF APPROVED DRAWING ON SIDE 11) STRUCTURE WILL BE CONSIDERED A HAZARD AND HAVE ALL VIOLATIONS ABATED |
02/20/2008 | ELECTRIC - FINAL | N/A | Denied | IVRS - Inspection : See detailed listing on site.| 999* |