Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Address:
1999 E AJO WY
Address NEW:
1999 E AJO WY
Apply Date:
05/11/2007
Applicant:
RELIABLE PERMIT MANAGEMENT
Description:
NEW CONVIENENCE STORE
Contractors:
  • RIO WEST DEVELOPMENT AND CONSTRU

Permit Reviews

Permit Number - T07CM01981
Permit Status: C of o
Permit Description: NEW CONVIENENCE STORE
Start Date Submittal Complete Date Status  
05/11/2007 PLANS OK TO SUBMIT - 3RD PARTY 05/14/2007 COMPLETED Review Details
05/14/2007 3RD PARTY REVIEW-COMMERCIAL 07/19/2007 COMPLETED Review Details
07/19/2007 POST 3RD PARTY REVIEW 07/23/2007 COMPLETED Review Details
10/04/2007 POST 3RD PARTY REVIEW 10/15/2007 COMPLETED Review Details
10/15/2007 3RD PARTY REVIEW-REVISION/OTHER 10/15/2007 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T07CM01981
Permit Status: C of o
Permit Description: NEW CONVIENENCE STORE
Total Outstanding Activity Conditions - 1
Date Name
05/11/2007 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T07CM01981
Permit Description: NEW CONVIENENCE STORE
Total Completed Inspections - 27
Date Description Inspector Results Comments
07/27/2007 ROOF NAILING AALEGRIA Approved IVRS - Inspection :*
08/23/2007 STUCCO MESH GDABBS Approved IVRS - Inspection :*
10/24/2007 MECHANICAL - INTERMEDIATE MRAMBER Approved IVRS - Inspection :*
11/01/2007 TEP CLEARANCE - AM JWEATHER Approved TEC CLEARED PER D. SANTACRUZ
11/02/2007 SITE - SEWER RLEDONNE Approved IVRS - Inspection :*
HCS OK
11/08/2007 SHEET ROCK NAILING GDABBS Approved IVRS - Inspection :*
11/08/2007 FRAMING GDABBS Approved IVRS - Inspection :*
11/08/2007 MECHANICAL - UNDERGROUND MRAMBER Approved IVRS - Inspection :*
11/08/2007 PLUMBING - YARD WTR LINE/TEST RLEDONNE Approved IVRS - Inspection :*
11/08/2007 ELECTRIC - UNDERGROUND DSANTACR Approved IVRS - Inspection :*
11/09/2007 REINFORCED MASONRY PRE-GROUT GDABBS Approved IVRS - Inspection :*
11/09/2007 OUTDOOR LIGHTING FINAL DSANTACR Approved IVRS - Inspection :*
11/09/2007 ELECTRIC - OUTDOOR LIGHTING DSANTACR Approved IVRS - Inspection :*
11/09/2007 ELECTRIC - INTERMEDIATE DSANTACR Approved IVRS - Inspection :*
11/09/2007 FIRE - FINAL LTHOMAS Approved
11/13/2007 SIGN - FINAL JYBARRA Approved TEMP C/O; MUST FINAL ELEC ON SIGNS & COMPLETE SIGNS
T07OT02195 BEFORE FINAL C/O CAN BE ISSUED
11/13/2007 ELECTRIC - CONSTRUCTION POWER DSANTACR Approved
11/13/2007 MECHANICAL - FINAL MRAMBER Approved IVRS - Inspection :*
11/13/2007 ELECTRIC - FINAL DSANTACR Approved IVRS - Inspection :*
11/14/2007 RIGHT OF WAY - FINAL LLOPEZ Approved PER EMAIL TEMP ONLY (R.O.W. WORK NOT COMPLETE)
11/14/2007 HEALTH DEPT - FINAL 724-7908 NRAMIREZ Approved PER CARD
11/14/2007 PLUMBING - FINAL RLEDONNE Approved PER INSP COPY
11/14/2007 LANDSCAPE - FINAL ACONNOR Approved 1. All site and landscape work must be complete (Minor items excluded)

2. Complete access routes

3. Minimize construction activity

4. Clean up debris

5. Fence off remaining construction

6. Verify that all Engineering comments and concerns are addressed.
11/14/2007 NPPO - FINAL ACONNOR Approved
11/14/2007 BUILDING - FINAL GDABBS Approved IVRS - Inspection :*
12/13/2007 ENGINEERING - FINAL MAVERY Approved Contractror needs to complete punch list:
1. Provide letter from engineer in regards to C.O.T. Drainage Manual, chapter XIV, section 14.2 (7).
2. Repair holes in asphalt.
3. Install rip rap on 2-12" CMP pipes that cross southeast entrance. Per approved drawings, note #19, detail Q/3 and H/2.
4. Install rip rap at all curb cuts. Per approved drawings, notes #3 and 16.
5. Install all curbing per approved drawings, note #1. (SD 209)
6. Complete all striping per approved drawings.
7. Install all curb cuts, per approved drawings, notes #3 and 16.
8. Stabilize all side slopes per the approved drawings.
9. Install basin on east side per the approved drawings.
10. Recess all landscape areas for water harvesting, per note #8, on approved drawings.
11. Paint post barricades in trash enclosure.
12. Install 12" CMP on north side of building, per approved drawings. (act. 4")
13. Install concrete catch basin per approved drawings, detail R/3.
14. Address ponding on northeast corner HC ramp.
15. Backfill around sidewalk northeast corner of project.
16. Complete all parking north side of building per approved drawings.
17. Address erosion northwest side of building. (per note #8 recess 6")
18. Complete public access from E. Ajo Way, per approved drawings.
19. Install concrete for loading zone southwest corner of building, per note #22 of approved drawings.
20. Install final lift of asphalt or adjust all utility manholes and boxes to grade.
21. Install 10' concrete pad in front of trash enclosure, per detail F/2 of the approved drawings.
22. Pin down all wheel stops, per detail D/2 on the approved drawings.
23. Install parking area on west, south and east side of building per note #22 of approved drawings.
24. Install drainage in rear of building per approved drawings.
25. Provide 24' PAAL for roadway north side of building. (act. 19'and 23')
26. Have engineer provide C.O.T. with approved revised drawing showing all changes for next inspection.
27. Engineer needs to address the use of asphalt in place of concrete. Provide data showing asphalt thickness.
Met with Joe site super and went over punch list.
06/30/2008 PERMIT FINALED LJACKSON Approved