Permit: T07CM01706
Permit Details
Apply Date:
04/24/2007
Applicant:
WLB GROUP
Description:
INSTALL:PIPE OUTLET
Permit Reviews
Permit Number - T07CM01706
Permit Status: Expired
Permit Description: INSTALL:PIPE OUTLET
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/24/2007 | OTHER | 04/24/2007 | COMPLETED |
| 10/02/2007 | OTHER | 10/02/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07CM01706
Permit Status: Expired
Permit Description: INSTALL:PIPE OUTLET
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/24/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T07CM01706
Permite Description: INSTALL:PIPE OUTLET
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/08/2007 | GRADING - FINAL | N/A | Partial Approval | MET WITH PATRICK WITH HABITAT ON SITE HANDRAIL STILL NEEDED SOME BACK FILL WORK NEEDS TO BE DONE STABILIZATION ASSOCIATED WITH T04BU01206 |
Completed Inspections
Permit Status: Expired
Permit Number: T07CM01706
Permit Description: INSTALL:PIPE OUTLET
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2007 | ENGINEERING PRE-CONSTRUCTION | NKALAHAR | Approved | MET WITH PATRICK WITH HABITAT WLB TO START STAKING 8/24 DIRT WORK TO START 8/27 |
| 10/23/2007 | GRADING - INTERMEDIATE | NKALAHAR | Approved | SAW PIPE INSTALLED IN TRENCH BEDDING MATERIAL ONSITE TALKED TO TANG WITH INNOVA 808-4447 ADVISED READY FOR BACK FILL |