Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
COMMERCIAL OTHER
Apply Date:
10/26/2007
Applicant:
N/A
Description:
ANEWCO - GRADING
Contractors:
  • RIO WEST DEVELOPMENT AND CONSTRU

Permit Reviews

Permit Number - T07BU02259
Permit Status: Issued
Permit Description: ANEWCO - GRADING
Start Date Submittal Complete Date Status  
02/04/2013 REVISION - GRADING 02/04/2013 COMPLETED Review Details
02/04/2013 REVISION - GRADING 02/13/2013 COMPLETED Review Details
02/21/2013 REVISION - GRADING 05/07/2013 COMPLETED Review Details
10/26/2007 PLANS OK TO SUBMIT - GRADING 10/26/2007 COMPLETED Review Details
10/26/2007 GRADING 12/10/2007 COMPLETED Review Details
11/01/2012 REVISION - GRADING 11/01/2012 COMPLETED Review Details
12/13/2007 GRADING 12/13/2007 COMPLETED Review Details
12/13/2007 RESUBMITTAL - GRADING 12/17/2007 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T07BU02259
Permit Status: Issued
Permit Description: ANEWCO - GRADING
Total Outstanding Activity Conditions - 2
Date Name
10/26/2007 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/29/2009 Expired Grading letter sent - 1st

Completed Inspections

Permit Status: Issued
Permit Number: T07BU02259
Permit Description: ANEWCO - GRADING
Total Completed Inspections - 8
Date Description Inspector Results Comments
01/15/2008 STORMWATER INSTALL OF CONTROLS NKALAHAR Approved SITE IS FULLY CURBED CURRENTLY
FENCING AROUND ENTIRE SITE
WATTLE INSTALLED ALONG PERIMETER
2 SCEs INSTALLED-ONE TO BE ENTRANCE ONLY ONE TO BE EXIT ONLY
01/15/2008 ENGINEERING PRE-CONSTRUCTION NKALAHAR Approved ROBERT DAFOE EXCAVATING DOING DIRT WORK
RIO WEST IS GENERAL CONTRACTOR
MICHAEL IS PM FOR ANEWCO 307-1308
09/29/2008 STORMWATER FOLLOW-UP INSP NKALAHAR Approved PAINT WASHED OUT IN WATER HARVESTING/BASIN AREA
11/24/2008 GRADING - INTERMEDIATE NKALAHAR Approved MET WITH MICHAEL ON SITE

H/C RAMP TO BE REMOVED ON SW CORNER OF SITE AT NEW LOADING DOCK AREA
12/17/2008 GRADING - FINAL NKALAHAR Approved -BASIN CERTIFICATON STILL REQUIRED
-ADA (NON) SIGN AT SW CORNER
12/17/2008 LANDSCAPE INSPECTION ACONNOR Approved
08/04/2010 GRADING - CHECK FOR ACTIVITY DROBERTS Approved MET ON-SITE WITH BRAD HOGUE AND THE REPRESENTATIVES TO DISCUSS THE CURRENT ISSUES THAT ARE REMAINING ON THIS SITE THAT WILL NEED TO BE ADDRESSED PRIOR TO SCHEDULING A FINAL INSPECTION. 1) REVISE THE GRADING PLAN TO REFLECT ALL OF THE CHANGES THAT HAVE BEEN APPROVED OR THAT NEED TO BE APPROVED. 2) REPAIR ALL DAMAGED AREAS OF THE PARKING LOT THAT HAVE NOT BEEN FULLY CONSTRUCTED. 3) REPLACE ALL MISSING BICYCLE RACKS THAT ARE NOT CURRENTLY IN PLACE AT THIS TIME. 4) CORRECT ALL ITEMS SHOWN ON THE AS-BUILT DRAWINGS THAT EITHER NEED TO BE CONSTRUCTED PER THE ORIGINAL PLANS OR CONSTRUCTED THE NEWLY REVISED DRAWINGS. 5) MAKE ALL ADA PEDESTRIAN ACCESSABLE.
05/09/2013 PERMIT FINALED KMEDINA Approved

Documents

File Name Document Type  
None CONSTRPLANS VIEW
100_3247.JPG IMAGES VIEW
SWPPP_MAP_001.TIF GRADING PLANS VIEW
SWPPP_MAP_002.TIF GRADING PLANS VIEW
APPROVED_001.TIF GRADING PLANS VIEW
APPROVED_002.TIF GRADING PLANS VIEW
APPROVED_003.TIF GRADING PLANS VIEW
APPROVED_004.TIF GRADING PLANS VIEW
APPROVED_005.TIF GRADING PLANS VIEW
APPROVED_006.TIF GRADING PLANS VIEW
001_SHEET 1 OF 6.TIF GRADING PLANS VIEW
002_SHEET 2 OF 6.TIF GRADING PLANS VIEW
003_SHEET 3 OF 6.TIF GRADING PLANS VIEW
004_SHEET 4 OF 6.TIF GRADING PLANS VIEW
005_SHEET 5 OF 6.TIF GRADING PLANS VIEW
006_SHEET 6 OF 6.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW
T07BU02259 ANEWCO.DOC DOCUMENTS VIEW
None DOCUMENTS VIEW
PERFORMANCE BOND.PDF DOCUMENTS VIEW
BOND RELEASE 2013_11_12.PDF DOCUMENTS VIEW