Permit Details

Status:
Expired
Type:
COMMERCIAL OTHER
Address NEW:
2984 S SANDARIO RD
Apply Date:
06/14/2007
Applicant:
SCOTT SCHLADWEILER
Description:
CUT 1,980,000CY FILL 1,980,000CY
Contractors:
  • S J L CONSTRUCTION OF ARIZONA ,

Permit Reviews

Permit Number - T07BU01318
Permit Status: Expired
Permit Description: CUT 1,980,000CY FILL 1,980,000CY
Start Date Submittal Complete Date Status  
02/07/2008 REVISION - GRADING 03/04/2008 ACTIVE Review Details
06/14/2007 PLANS OK TO SUBMIT - GRADING 06/19/2007 COMPLETED Review Details
06/19/2007 GRADING 08/22/2007 COMPLETED Review Details
08/22/2007 RESUBMITTAL - GRADING 08/29/2007 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T07BU01318
Permit Status: Expired
Permit Description: CUT 1,980,000CY FILL 1,980,000CY
Total Outstanding Activity Conditions - 3
Date Name
06/14/2007 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
08/22/2007 LANDSCAPE INSPECTOR MUST CHECK FENCING OF NATURAL AREAS PRIOR TO GRUBBING OR GRADING.
08/15/2007 1) Admin.Dir.1.07-6.III.A: The following 5 conditions apply to grading permit T07BU01318: a) This permit is for the initial phase of the Tucson Water SAVSARP recharge basin project only. b) The Southern Avra Valley Storage And Recovery Project (SAVSARP) Recharge Facilities and Raw Water Delivery Pipeline (CIP Nos.W339 and W439) plans are a part of the grading permit. See also Floodplain Drainage Analysis Report for Southern Avra Valley Storage and Recovery Project (SAVSARP) by TetraTech dated 09/20/06 and Addendum dated 05/14/07, engineering response letters dated May 31, 2007, June 5, 2007, CH2MHILL Geotechnical Design Report dated 7/12/06, ERR dated June 2007, and Tucson Water Plan No.9-062-2006 and specifications. c) Benchmark and datum information is provided on sheet G-9 of the Grading Plan set. d) All proposed structures for this project shall be set at a minimum of 1-foot above the jurisdictional water surface elevation as shown on the approved plans and drainage report. e) Submit a copy of the as-builts to the City of Tucson Development Services Department upon completion. f) The remaining signatures for the operators on Certification Statements on sheet G-10 must be on the site copy of the Stormwater Pollution Prevention Plan (SWPPP) at, or before, commencement of construction. At minimum, one operator, either the engineer of record or the project manager shall sign the certification. g) The following conditions shall be completed prior to commencement of any earthwork activities: i) Prior to commencement of any earthwork activities, provide copy of the report for the levee maintenance plan that provides discussion of how the levee structures shall be maintained, including identification and procedure for maintenance inspection and schedule. The maintenance plan shall include an assessment as to whether Levee B shall be upgraded. ii) Prior to commencement of any earthwork activities, a copy of the updated SWPPP, with a copy of General Permit, showing on planview locations of the proposed stabilization practices / interim erosion control methods shall be submitted to the City of Tucson Development Services Department Engineering Division. The updated SWPPP shall have the registrant's seal on sheets G-10 through G13 of the SWPP. The SWPP shall clearly delineate disturbance area / limits of grading. 2) DS Sec.10-02.2.3.1.2.F: All conditions of Pima County Regional Flood Control District Floodplain Use Permit No.07-438 approved 6/7/07 shall apply. 3) DS Sec.11-01.4.1.C: Additional grading and floodplain review by the City of Tucson Development Services Department will be required for permits for the future booster station structure. At the time when permits are required for the booster station, it will be determined whether Levee B will need to be upgraded. For the booster station permit review, submit grading plans, updated SWPPP, and a drainage report that includes: a) WSEL's adjacent to the proposed structure. b) Finished building elevation at a minimum of one foot above the regulatory floodplain water surface elevation. c) Discussion of stormwater velocities at booster station building pad and extents of any needed erosion protection so that the Tucson Water booster station site will be protected from 100- year floodplain scour and erosion. d) Discussion of the levee structure to protect the booster station or other intent. Any levee proposed to be recognized as a permanent structure by FEMA needs to show conformance with NFIP section 65.10(b-e) including erosion protection, seepage, settlement, and other levee design criteria, as well as operation, maintenance, and certification plans. Include an assessment as to whether Levee B shall be upgraded. e) Tucson Code Sec. 26-8(a)(2)b: Provide discussion regarding how the booster station will be: constructed so as to minimize or eliminate flood damage; constructed to minimize or eliminate flood and erosion damage; designed with strict conformance to the public's health, safety and welfare; and evaluated to prevent any contamination of the groundwater aquifer. f) DS Sec.11-01.4.1.C: Grading plan shall show delineation for disturbance area / limits of grading; shall provide local benchmark on plan view and datum information relative to the floodplain data; shall clarify extents of erosion protection; shall show erosion protection for Tucson Water site so that their site will be protected from floodplain scour and erosion; and shall provide estimates for cut/fill and for total disturbance area in square feet. 4) For gas lines and any other utilities, contact the utility company for coordinating grading construction. 5) Submit two half size copies of the approved plan sets to the City of Tucson Development Services Department Engineering Division.

Outstanding Inspections

Permit Status: Expired
Permit Number: T07BU01318
Permite Description: CUT 1,980,000CY FILL 1,980,000CY
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
NPPO PRE PERMIT INSPECTION N/A Not Inspected
LANDSCAPE INSPECTION N/A Not Inspected
GRADING - CHECK FOR ACTIVITY N/A Not Inspected
11/12/2009 GRADING - FINAL N/A Continued CALLED OUT FOR INSPECTION. INSPECTION THEN REQUESTED LATER IN THE DAY. UPON ARRIVAL INSPECTION CANCELLED, CARD SIGNED BY BUILDING INSPECTOR.

Completed Inspections

Permit Status: Expired
Permit Number: T07BU01318
Permit Description: CUT 1,980,000CY FILL 1,980,000CY
Total Completed Inspections - 3
Date Description Inspector Results Comments
12/14/2007 STORMWATER INSTALL OF CONTROLS MAVERY Approved Contractor cleared site. Controls up, need minor repairs.
11/25/2009 ENGINEERING PRE-CONSTRUCTION MCARREON Approved ROUTINE SITE INSPECTION
11/25/2009 ENGINEERING PRE-CONSTRUCTION MCARREON Approved MET WITH CONTRACTOR-ADDRESSED QUESTIONS REGARDING SITE STABILIZATION.