Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T06PL02350
Permit Details
Apply Date:
12/19/2006
Applicant:
LYONS' SOUTHWEST CONSTRUCTION ,
Description:
REPLACE EXISTING WATER HEATER
Contractors:
- LYONS' SOUTHWEST CONSTRUCTION ,
- WOODS PLUMBING ENTERPRISES LLC *T
Permit Reviews
Permit Number - T06PL02350
Permit Status: Expired
Permit Description: REPLACE EXISTING WATER HEATER
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/19/2006 | PLUMBING | 12/21/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06PL02350
Permit Status: Expired
Permit Description: REPLACE EXISTING WATER HEATER
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/19/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T06PL02350
Permite Description: REPLACE EXISTING WATER HEATER
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/03/2007 | PLUMBING - YARD WTR LINE/TEST | N/A | Partial Approval | IVRS - Inspection :* NEW 2" FROM METER TRAVELS APP 5' SPLITS TO 1 1/2 SHUT OFF VALVE FOR EXISTING BUILDING SUPPLY AND NEW 2" SHUT OFF THRU NEW PIPING BOTH UP AT BUILDING TO 1 1/2 RPB +2" RPB THRU INTO BUILDING. PER TOM CLARK TUCSON WATER BACKFLOW DIVISION 1 1/2 RPA TO BE AT METER LOCATION JUST INSIDE PROPERTY LINE. WATER TEST OK FOR PIPING. |
| 12/26/2006 | PLUMBING - FINAL | N/A | Not ready for Inspection | IVRS - Inspection :* |
| 12/27/2006 | PLUMBING - GAS PRESSURE TEST | N/A | Not ready for Inspection | NEW PIPING INSTALLED IN MECH. ROOM REQUIRES ENTIRE SYSTEM TO MEET 2003 UPC REQUIREMENTS. 1. SHALL PROVIDE BONDING OF BUILDING GAS PIPING 2. GAVE HANDOUT FOR GAS PIPING UNDERGROUND UNDER BUILDING OR STRUCTURE FOR SLEEVING REQUIREMENTS TO CONTRACTOR. 3. UNDERGROUND PIPING SHALL BE PRIMED & TAPED AT TOOL MARKS. 4. UNIONS SHALL BE ACCESSIBLE. RETEST SYSTEM PLEASE HAVE WATER SUPPLY CONNECTED TO BOILER |