Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
COMMERCIAL OTHER
Apply Date:
07/19/2006
Applicant:
GILBERT ELECTRIC COMPANY INC *C
Description:
FLOODPLAIN USE PERMIT
Contractors:
  • GILBERT ELECTRIC COMPANY INC *C

Permit Reviews

Permit Number - T06OT01896
Permit Status: Issued
Permit Description: FLOODPLAIN USE PERMIT
Start Date Submittal Complete Date Status  
07/19/2006 PLANS OK TO SUBMIT - FLOODPLAIN 07/19/2006 COMPLETED Review Details
07/19/2006 FLOODPLAIN 08/01/2006 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T06OT01896
Permit Status: Issued
Permit Description: FLOODPLAIN USE PERMIT
Total Outstanding Activity Conditions - 1
Date Name
07/19/2006 July 19, 2006 (Special Inspection Required) The applicant is authorized to use a portion of the flood hazard area in the City of Tucson, Arizona, on the property described as 601 E Fort Lowell Road for the purpose of installing a temporary office trailer. The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard regulations, and are particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations and Watercourse Amenities, Safety, and Habitat regulations require the issuance of an additional Floodplain Use Permit. The following conditions shall apply to this permit. 1. An Arizona Registered Civil Engineer shall certify that the sales trailer is anchored against flotation. 2. The lowest structural member and all associated facilities of the buildings in the property under this permit shall be placed a minimum of 2351.0 feet above mean sea level, NGVD 1929 as Certified by a Registered Land Surveyor. This certification must be completed and returned to the Development Services Dept., Engineering Section on the 1st. Floor of the County/City Public Works Building at 201 N. Stone Avenue. 3. Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties. 4. This permit becomes invalid and is subject to additional floodplain review, if any required development permit(s') changes the configuration of the structure and or site development. This Floodplain Use Permit will be automatically revoked and becomes invalid for non-compliance to conditions set forth in this permit. Also, this permit will expire one year from its date of issue. Renewal of this permit will require a new application, review and approval of that application by the City of Tucson, Development Services Department, Engineering Section. (EXPIRATION DATE) Month: 7 Day: 19 Year: 2007 Note: Final inspection or certificate of occupancy will be on hold until the Elevation Certificate is completed and returned to our office. The applicant is authorized by the City Engineer to receive a floodplain use permit subject to the above referenced conditions and restrictions.

Documents

File Name Document Type  
None DOCUMENTS VIEW