Permit: T06OT01190
Permit Details
Status:
Withdrwn
Type:
SINGLE FAMILY OTHER
Address:
2739 N WALNUT AV #02
Address NEW:
2739 N WALNUT AV #02
Apply Date:
05/03/2006
Applicant:
RELIABLE PERMIT MANAGEMENT
Description:
FLOODPLAIN USE PERMIT
Permit Reviews
Permit Number - T06OT01190
Permit Status: Withdrwn
Permit Description: FLOODPLAIN USE PERMIT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/03/2006 | PLANS OK TO SUBMIT - FLOODPLAIN | 05/03/2006 | COMPLETED |
| 05/03/2006 | FLOODPLAIN | 05/15/2006 | STOPPED |
Outstanding Activity Conditions
Permit Number - T06OT01190
Permit Status: Withdrwn
Permit Description: FLOODPLAIN USE PERMIT
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/12/2006 | May 12, 2006 FLOODPLAIN USE PERMIT NO.: T06OT01190 / T06CM01918 ADDRESS: 2739 N. Walnut Ave. #2 APPLICANT: Mike Kreus, Reliable Permit Management The applicant is authorized to use a portion of the City of Tucson property described as (legal description): Catalina Farms S60' of N268' of W 136.21' L 4 1. This permit is for the purpose of construction of a single-family residence within a mapped Flood Hazard Area, Zone X (Shaded), as shown on the Flood Insurance Rate Map (FIRM), Community Panel No. 040076-04019C-1644K, effective date February 8, 1999. 2. The proposed structure is impacted by the regulatory floodplain. For purposes of this permit, the following elevation requirements apply: Base Flood Elevation (BFE) = 1.0 feet above highest adjacent natural grade Regulatory Flood Elevation (RFE) = 2.0 feet above highest adjacent natural grade Residence to have lowest finished floor elevated at or above the Regulatory Flood Elevation (RFE). Service facilities, such as electrical, heating and cooling equipment, shall be constructed at or above the same minimum elevation as the FFE and either be placed on flood proof materials or be adequately flood proofed. A Building Under Construction Elevation Certificate, completed and certified by an Arizona Registered Land Surveyor, must be returned to the Engineering Division of the Development Services Department. A hold will be placed on the slab inspection (P2S) until the Elevation Certificate has been returned and approved. A Finished Construction Elevation Certificate must be returned to the Engineering Division and approved prior to the issuance of the certificate of occupancy. 3. Any additional improvements, including block walls, fences or pools, will require a separate Floodplain Use Permit prior to construction. |