Permit: T06CM05399
Permit Details
Status:
Expired
Type:
SINGLE FAMILY ADDITION
Address:
4210 E PASEO DORADO
Address NEW:
4210 E PASEO DORADO
Apply Date:
10/10/2006
Applicant:
JOSEPH A COALLA
Description:
ADDT: 1 BEDRM AND BATHRM
Permit Reviews
Permit Number - T06CM05399
Permit Status: Expired
Permit Description: ADDT: 1 BEDRM AND BATHRM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/10/2006 | RESIDENTIAL BLDG/ZONING/ENGINE/WWM | 10/20/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06CM05399
Permit Status: Expired
Permit Description: ADDT: 1 BEDRM AND BATHRM
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/10/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T06CM05399
Permite Description: ADDT: 1 BEDRM AND BATHRM
Total Outstanding Inspections - 14
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| STEM WALL/RETAINING WALL | N/A | Not Inspected | ||
| EXT METAL CLIPS/EXT SHEATHING | N/A | Not Inspected | ||
| ROOF NAILING | N/A | Not Inspected | ||
| FRAMING | N/A | Not Inspected | ||
| STUCCO MESH | N/A | Not Inspected | ||
| U VALUE FOR WINDOW | N/A | Not Inspected | ||
| SHEET ROCK NAILING | N/A | Not Inspected | ||
| BUILDING - FINAL | N/A | Not Inspected | ||
| ELECTRIC - INTERMEDIATE | N/A | Not Inspected | ||
| ELECTRIC - FINAL | N/A | Not Inspected | ||
| PLUMBING - INTERMEDIATE | N/A | Not Inspected | ||
| PLUMBING - FINAL | N/A | Not Inspected | ||
| MECHANICAL - INTERMEDIATE | N/A | Not Inspected | ||
| MECHANICAL - FINAL | N/A | Not Inspected |
Completed Inspections
Permit Status: Expired
Permit Number: T06CM05399
Permit Description: ADDT: 1 BEDRM AND BATHRM
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2006 | PLUMBING - GAS PRESSURE TEST | DQUINN | Approved | IVRS - Inspection :* |
| 12/21/2006 | EXCAVATION/LAYOUT REBAR & ZON | DQUINN | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1. REBAR MUST BE UP OFF OF FOOTING DIRT TO GET A MINIMUM OF A 3" ENCASEMENT OF CONCRETE. 2. NEED A 10' HEAD TEST ON ALL UNDERGROUND PLUMBING 3. PLAN SHOWS 2-WAY CLEANOUT OUTSIDE BATHROOM. |
| 12/21/2006 | BUILDING PRE-SLAB | DQUINN | Approved | IVRS - Inspection :* |
| 12/29/2006 | PLUMBING - ROUGH, SOIL | DQUINN | Approved | IVRS - Inspection :* |