Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Address NEW:
7411 E TANQUE VERDE RD
Apply Date:
08/17/2005
Applicant:
N/A
Description:
NEW OFFICE BLDG
Architects:
  • EGLIN, EVAN SAR
Contractors:
  • VENTURE WEST INC

Permit Reviews

Permit Number - T05CM04307
Permit Status: C of o
Permit Description: NEW OFFICE BLDG
Start Date Submittal Complete Date Status  
01/18/2006 3RD PARTY REVIEW-REVISION/OTHER 01/20/2006 COMPLETED Review Details
08/17/2005 PLANS OK TO SUBMIT - COMM 08/26/2005 COMPLETED Review Details
08/26/2005 3RD PARTY REVIEW-COMMERCIAL 10/17/2005 COMPLETED Review Details
10/17/2005 POST 3RD PARTY REVIEW 10/18/2005 COMPLETED Review Details
12/06/2005 3RD PARTY REVIEW-REVISION/OTHER 12/14/2005 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T05CM04307
Permit Status: C of o
Permit Description: NEW OFFICE BLDG
Total Outstanding Activity Conditions - 1
Date Name
08/17/2005 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T05CM04307
Permit Description: NEW OFFICE BLDG
Total Completed Inspections - 39
Date Description Inspector Results Comments
11/15/2005 PLUMBING - ROUGH, SOIL TRINIVJR Approved IVRS - Inspection :*SOIL WATER TEST IS OK
HCS CONNECTION IS OK
OK TO BACKFILL TRENCH
11/15/2005 PLUMBING - SEWER HCS CONNECT TRINIVJR Approved IVRS - Inspection :*
12/14/2005 ELECTRIC - UNDERGROUND RHOLLAND Approved IVRS - Inspection :*OK 2 FLOOR BOXES
12/15/2005 ELECTRIC - UFER RSUBA Approved IVRS - Inspection :*1-4" SERVICE FEEDER
3" TELEPHONE
12/15/2005 BUILDING PRE-SLAB JCAGLE Approved IVRS - Inspection :*
12/29/2005 EXCAVATION/LAYOUT REBAR & ZON JCAGLE Approved IVRS - Inspection :*
COLUMN FOOTINGS FOR CANOPY
01/19/2006 ROOF NAILING JCAGLE Approved IVRS - Inspection :*
02/17/2006 EXT METAL CLIPS/EXT SHEATHING JCAGLE Approved IVRS - Inspection :*
WILL VERIFY HOLDDOWN & ANCHOR BOLTS SPACING WITH FRAMING (01035)
02/21/2006 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection :*
WATER TEST WASTE & VENT THRU ROOF OK
WATER PIPING OK
CLOSET FLANGES OK
03/03/2006 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
SUSPENDED ROUGH DUCT, SUPPLY & EXHAUST, CONDENSATE DRAINS ALL OK
OK TO SHEETROCK
03/03/2006 FRAMING JCAGLE Approved IVRS - Inspection :*
OK TO SHEETROCK
03/06/2006 ELECTRIC - INTERMEDIATE RHOLLAND Approved OK ON 3/2/06
03/15/2006 REINFORCED MASONRY PRE-GROUT JCAGLE Approved IVRS - Inspection :*
03/17/2006 STUCCO MESH JCAGLE Approved IVRS - Inspection :*
03/20/2006 PLUMBING - YARD WTR LINE/TEST RRICH Approved IVRS - Inspection :*
04/17/2006 MECHANICAL - ABOVE CEILING JMILITEL Approved IVRS - Inspection :*
- OK FOR CEILING TILES.
- IN THE FUTURE HAVE APPROVED PLANS IN THE SUITE AT TIME OF INSPECTION.
04/18/2006 PLUMBING - ABOVE CEILING RRICH Approved IVRS - Inspection :*
04/19/2006 ELECTRIC - CABLE DROP RHOLLAND Approved IVRS - Inspection :*
05/24/2006 ELECTRIC - ABOVE CEILING RHOLLAND Approved IVRS - Inspection :*
OK TO TILE
05/26/2006 TEP CLEARANCE - AM JWEATHER Approved TMPP CLEARED PER R. HOLLANDER
05/31/2006 BUILDING ABOVE CEILING JBURGE Approved IVRS - Inspection :*
05/31/2006 SHEET ROCK NAILING JBURGE Approved IVRS - Inspection :*
06/29/2006 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
1) OK FOR FINAL
06/29/2006 NPPO - FINAL ACONNOR Approved
06/29/2006 LANDSCAPE - FINAL ACONNOR Approved
06/29/2006 SIGN - FINAL JYBARRA Approved IVRS - Inspection :*
06/29/2006 RIGHT OF WAY - FINAL PWHIDDON Approved PER EMAIL
06/30/2006 OUTDOOR LIGHTING FINAL RHOLLAND Approved IVRS - Inspection :*
06/30/2006 ELECTRIC - OUTDOOR LIGHTING RHOLLAND Approved IVRS - Inspection :*
06/30/2006 ELECTRIC - CONSTRUCTION POWER RHOLLAND Approved IVRS - Inspection :*
07/06/2006 U VALUE FOR WINDOW JBURGE Approved IVRS - Inspection :*
07/06/2006 ELECTRIC - FINAL RHOLLAND Approved IVRS - Inspection :*
07/06/2006 ELECTRIC - TEMP POWER FOR TEST RHOLLAND Approved IVRS - Inspection :*
07/06/2006 FIRE - FINAL LTHOMAS Approved
07/07/2006 PLUMBING - FINAL RRICH Approved IVRS - Inspection :*
PROVIDE ACCESS TO CLEAN OUT IN CONFERENCE #103 SINK WITH CORREC TAPED PLUG & MACHINE SCRES & CLEANOUT COVER.
07/07/2006 BUILDING - FINAL JBURGE Approved IVRS - Inspection :*
07/07/2006 SITE - SEWER RRICH Approved NOT REQUIRED -- INSPECTED ON SEPARATE PERMIT.
08/03/2006 ENGINEERING - FINAL JBRUCKME Approved
08/14/2006 PERMIT FINALED DROBEY Approved

Documents

File Name Document Type  
TEMP C OF O_07-07-2006.TIF CERT OF OCC VIEW
C OF O_08-14-2006.TIF CERT OF OCC VIEW
None DOCUMENTS VIEW