Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T05CM00773
Permit Details
Apply Date:
02/22/2005
Applicant:
FRANK MENDOZA
Description:
RETAIL STORE HOME DEPOT
Contractors:
- TRIUMPH BUILDERS SOUTHWEST LLC *C*
Permit Reviews
Permit Number - T05CM00773
Permit Status: C of o
Permit Description: RETAIL STORE HOME DEPOT
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/22/2005 | PLANS OK TO SUBMIT - 3RD PARTY | 02/22/2005 | COMPLETED |
02/22/2005 | PLANS OK TO SUBMIT - SITE | 03/07/2005 | COMPLETED |
02/22/2005 | 3RD PARTY REVIEW-COMMERCIAL | 04/26/2005 | COMPLETED |
03/07/2005 | SITE | 06/02/2005 | COMPLETED |
04/26/2005 | POST 3RD PARTY REVIEW | 06/02/2005 | COMPLETED |
06/02/2005 | OTHER | 06/06/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05CM00773
Permit Status: C of o
Permit Description: RETAIL STORE HOME DEPOT
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
02/22/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T05CM00773
Permit Description: RETAIL STORE HOME DEPOT
Total Completed Inspections - 51
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/04/2005 | PLUMBING - GAS PRESSURE TEST | RMYERS | Approved | IVRS - Inspection :* LOW PRESSURE THREADED PIPING INSTALLED PRESSURE TEST OK |
10/12/2005 | ELECTRIC - UFER | RSUBA | Approved | IVRS - Inspection :* |
10/18/2005 | BUILDING - PROGRESS | AQUIROZ | Approved | IVRS - Inspection :* |
10/18/2005 | BUILDING ABOVE CEILING | AQUIROZ | Approved | IVRS - Inspection :* |
10/18/2005 | ELECTRIC - TEMP POWER FOR TEST | RSUBA | Approved | IVRS - Inspection :* |
10/19/2005 | TEP CLEARANCE - AM | JKOZUCH | Approved | ECO |
10/21/2005 | ELECTRIC - CONSTRUCTION POWER | RSUBA | Approved | IVRS - Inspection :* |
10/21/2005 | ELECTRIC - ABOVE CEILING | RSUBA | Approved | IVRS - Inspection :* |
10/21/2005 | ELECTRIC - INTERMEDIATE | RSUBA | Approved | IVRS - Inspection :* |
10/21/2005 | ELECTRIC - UNDERGROUND | RSUBA | Approved | IVRS - Inspection :* |
10/21/2005 | PLUMBING - ROOF DRAINS | RMYERS | Approved | IVRS - Inspection :*PVC ROOF DRAINS OK OK TO COVER |
10/23/2005 | PLUMBING - YARD WTR LINE/TEST | RMYERS | Approved | IVRS - Inspection :* 1) REVIEWED NOTES AND HIGHLIGHTS WITH GENERAL CONTRACTOR 2) OK TO COVER ALL AREAS |
10/23/2005 | PLUMBING - PROGRESS | RMYERS | Approved | IVRS - Inspection :* |
10/23/2005 | PLUMBING - GAS PRESS TEST FNL | RMYERS | Approved | IVRS - Inspection :* |
10/23/2005 | PLUMBING - ABOVE CEILING | RMYERS | Approved | IVRS - Inspection :* |
10/23/2005 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection :* |
10/24/2005 | FRAMING | AQUIROZ | Approved | IVRS - Inspection :* |
10/24/2005 | EXT METAL CLIPS/EXT SHEATHING | AQUIROZ | Approved | IVRS - Inspection :* |
10/25/2005 | SHEET ROCK NAILING | AQUIROZ | Approved | IVRS - Inspection :* |
10/25/2005 | U VALUE FOR WINDOW | AQUIROZ | Approved | IVRS - Inspection :* |
10/25/2005 | STUCCO MESH | AQUIROZ | Approved | IVRS - Inspection :* |
10/25/2005 | ROOF NAILING | AQUIROZ | Approved | IVRS - Inspection :* |
10/25/2005 | REINFORCED MASONRY PRE-GROUT | AQUIROZ | Approved | IVRS - Inspection :* |
10/25/2005 | BUILDING PRE-SLAB | AQUIROZ | Approved | IVRS - Inspection :* |
10/25/2005 | STEM WALL/RETAINING WALL | AQUIROZ | Approved | IVRS - Inspection :* |
10/25/2005 | EXCAVATION/LAYOUT REBAR & ZON | AQUIROZ | Approved | IVRS - Inspection :* |
11/04/2005 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
11/04/2005 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
11/04/2005 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
11/04/2005 | PLUMBING - SEWER HCS CONNECT | RMYERS | Approved | IVRS - Inspection SITE CONTRACTOR ( TRIUMPH) RAN SEWER FROM LIMBERLOST UP TO TWO WAY CLEAN OUT-CONNECTION MADE OK SITE CONTRACTOR EXTENDED BRANCH FROM MANHOLE TO FIVE FEET FROM BUILDING . MADERA MECH MADE CONNECTION TO SITE SEWER. |
11/04/2005 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :* |
12/08/2005 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
12/08/2005 | FIRE - FINAL | LTHOMAS | Approved | |
12/09/2005 | OUTDOOR LIGHTING FINAL | CCLEMENS | Approved | IVRS - Inspection :* |
12/09/2005 | ELECTRIC - OUTDOOR LIGHTING | CCLEMENS | Approved | IVRS - Inspection :* |
12/09/2005 | NPPO - FINAL | ACONNOR | Approved | OK for Temp. C of O |
12/09/2005 | LANDSCAPE - FINAL | ACONNOR | Approved | OK for Temp. C of O |
12/12/2005 | ELECTRIC - CABLE DROP | CWILLIAM | Approved | |
12/12/2005 | ELECTRIC - PROGRESS | CWILLIAM | Approved | |
12/12/2005 | MECHANICAL - HOOD SYSTEMS | CWILLIAM | Approved | |
12/12/2005 | MECHANICAL - PROGRESS | CWILLIAM | Approved | |
12/12/2005 | ELECTRIC - FINAL | CCLEMENS | Approved | IVRS - Inspection :* OK ELECTRIC FINAL - OK EMERGENCY LIGHT TEST |
12/12/2005 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection :* |
12/12/2005 | MECHANICAL - ABOVE CEILING | CWILLIAM | Approved | IVRS - Inspection :* |
12/12/2005 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | IVRS - Inspection :* |
12/12/2005 | PLUMBING - FINAL | RMYERS | Approved | IVRS - Inspection :* 1. CORRECTIONS MADE OK 2. PLUMBING FINAL OK 3. OK FOR C OF O -- PENDING ANY OTHER INSPECTION |
12/13/2005 | BUILDING - FINAL | AQUIROZ | Approved | IVRS - Inspection :* 1) OK TEMP C OF O AS PER E. DURATE |
12/13/2005 | ENGINEERING - FINAL | JBRUCKME | Approved | TEMPORARY C OF O APPROVED. PREMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR TO4BU00946 IS COMPLETED AND APPROVED. 1. COMPLETE ALL OUTSTANDING ITEMS LISTED ON 11/04/05 INSPECTION REPORT FOR THE HOME DEPOT. 2. PROVIDE ALL SIGNAGE AT ENTRANCE AND EXIT DRIVEWAYS. BEFORE OPENING AT 5:00PM ON 12/14/05. 3. COMPLETE PLAZA SEATING AREA AT NORTHWEST CORNER OF LOT. 4. PROVIDE THE GATE ON THE PALLET STORAGE AREA EAST OF BLDG. ESTIMATED COMPLETION DATE 12/16/05 5. COMPLETE CONSTRUCTION OF RETENTION/DETENTION BASINS AND PROVIDE FULL 8" DRAINAGE OPENINGS IN THE SITE WALL. ESTIMATED COMPLETION DATE 12/23/05. 6. PROVIDE BICYCLE PARKING AS SHOWN ON THE DEVELOPMENT PLAN. ESTIMATED COMPLETION DATE 12/28/05 7. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS ON UN-BUILT LOTS ADJACENT TO HOME DEPOT. 8. BARRICADE ALL AREAS WHERE ON-GOING CONSTRUCTION ACTIVITY IS OCCURRING TO PREVENT PEDESTRIAN/PUBLIC ACCESSS, INCLUDING AREAS OUTSIDE SITE WALL ON NEFFSON AND LIMBERLOST ROAD. 9. PROVIDE SAFE PEDESTRIAN ACCESS TO SIDEWALKS ALONG THE SPINE ROAD. MOVE THE TEMPORARY CONSTRUCTION FENCE ROAD TO THE WEST OF THE SIDEWALK. |
12/08/2006 | SIGN - FINAL | JYBARRA | Approved | |
12/29/2006 | RIGHT OF WAY - FINAL | MOTERO | Approved | PER EMAIL TEMP ONLY (FINAL UNDER P.I.A.) |
01/11/2007 | PERMIT FINALED | BGRANT | Approved |