Permit: T05CM00219
Permit Details
Apply Date:
01/18/2005
Applicant:
OLIVAS ARTURO A
Description:
ADDITION:BEDROOM/BATHROOM REVISION: WALL UNIT OPTION TO DUCT CONNECTION
Permit Reviews
Permit Number - T05CM00219
Permit Status: Final
Permit Description: ADDITION:BEDROOM/BATHROOM
REVISION: WALL UNIT OPTION TO DUCT CONNECTION
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/18/2005 | RESIDENTIAL BLDG/ZONING/ENGINE/WWM | 02/11/2005 | COMPLETED |
| 02/11/2005 | RESIDENTIAL BLDG/WWM | 04/26/2005 | COMPLETED |
| 04/26/2005 | RESUBMITTAL | 07/12/2005 | COMPLETED |
| 10/25/2005 | REVISION - WALK THRU | 11/03/2005 | COMPLETED |
| 11/08/2005 | REVISION - WALK THRU | 11/08/2005 | COMPLETED |
| 11/24/2006 | REVISION - WALK THRU | 11/24/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05CM00219
Permit Status: Final
Permit Description: ADDITION:BEDROOM/BATHROOM
REVISION: WALL UNIT OPTION TO DUCT CONNECTION
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/18/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T05CM00219
Permit Description: ADDITION:BEDROOM/BATHROOM
REVISION: WALL UNIT OPTION TO DUCT CONNECTION
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/01/2005 | PLUMBING - ROUGH, SOIL | EDURAZO | Approved | IVRS - Inspection :* |
| 12/05/2005 | BUILDING PRE-SLAB | EDURAZO | Approved | IVRS - Inspection :* |
| 12/05/2005 | STEM WALL/RETAINING WALL | EDURAZO | Approved | IVRS - Inspection :* |
| 12/05/2005 | EXCAVATION/LAYOUT REBAR & ZON | EDURAZO | Approved | IVRS - Inspection :* |
| 12/22/2005 | REINFORCED MASONRY PRE-GROUT | HPEDROZA | Approved | IVRS - Inspection :* |
| 06/12/2008 | EXT METAL CLIPS/EXT SHEATHING | RCAMACHO | Approved | IVRS - Inspection :* |
| 06/17/2008 | ELECTRIC - INTERMEDIATE | RCAMACHO | Approved | IVRS - Inspection :* |
| 06/23/2008 | PLUMBING - SEWER HCS CONNECT | CRUIZ | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
| 06/23/2008 | U VALUE FOR WINDOW | CRUIZ | Approved | IVRS - Inspection :* |
| 06/23/2008 | ROOF NAILING | CRUIZ | Approved | IVRS - Inspection :* |
| 08/15/2008 | MECHANICAL - INTERMEDIATE | CRUIZ | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
| 10/28/2008 | PLUMBING - INTERMEDIATE | RCAMACHO | Approved | IVRS - Inspection :* |
| 12/26/2008 | FRAMING | WLAHR | Approved | IVRS - Inspection :* |
| 05/04/2009 | SHEET ROCK NAILING | RCAMACHO | Approved | IVRS - Inspection :* |
| 10/27/2009 | ELECTRIC - FINAL | RCAMACHO | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) BEDROOM WINDOW BARS MUST OPERATE WITHOUT USE OF SEPERATE TOOLS, OMIT LOCK 2) CHANGE LIGHT FIXTURE CLOSET WITH GLOBE FIXTURE 3) BATHROOM NOT COMPLETE ENOUGH TO INSPECT |
| 10/27/2009 | MECHANICAL - FINAL | RCAMACHO | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
| 08/30/2016 | PLUMBING - FINAL | RCAMACHO | Approved | IVRS - Inspection :* |
| 08/30/2016 | BUILDING - FINAL | RCAMACHO | Approved | IVRS - Inspection :* |