Permit Details

Status:
Withdrwn
Type:
COMMERCIAL OTHER
Address:
4050 E BENSON HY
Apply Date:
07/29/2005
Applicant:
ANTHONY HERRERA
Description:
GRADING:CUT 11900 FILL 70300

Permit Reviews

Permit Number - T05BU01915
Permit Status: Withdrwn
Permit Description: GRADING:CUT 11900 FILL 70300
Start Date Submittal Complete Date Status  
01/03/2008 RESUBMITTAL - GRADING ALL 03/20/2008 ACTIVE Review Details
07/29/2005 PLANS OK TO SUBMIT - GRADING 07/29/2005 COMPLETED Review Details
07/29/2005 GRADING 09/22/2005 COMPLETED Review Details
08/10/2006 RESUBMITTAL - GRADING ALL 11/02/2006 COMPLETED Review Details
09/24/2007 RESUBMITTAL - GRADING 12/06/2007 COMPLETED Review Details
12/06/2007 RESUBMITTAL - GRADING ALL 01/03/2008 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T05BU01915
Permit Status: Withdrwn
Permit Description: GRADING:CUT 11900 FILL 70300
Total Outstanding Activity Conditions - 7
Date Name
07/29/2005 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
01/15/2008 NPPO PRE PERMIT INSPECTION MUST BE PERFORMED PRIOR TO GRUBBING OR GRADING.
03/04/2008 The following 19 conditions apply to this grading permit T05BU01915: 1) Call for Pre-construction meeting. For a DSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2) A copy of the approved Grading Plan and Permit shall be kept at the site at all times, until final grading approval. 3) These sets of plans act as the approved final grading plans for private grading, paving and drainage construction for CANTERA Subdivision Grading Plans, 4050 E Benson Hy. This grading permit T05BU01915 provides permission to perform private grading, stockpile removal, paving and drainage improvement construction as shown on the approved plans. See Floodplain Use Permit T07OT02747 for Floodplain Use Permit conditions. 4) See the approved Grading Plans for Private CANTERA Private Grading Plans (sealed by Jefferson D. Stine, 12-20-07). The grading permit T05BU01915 will be for earthwork and grading construction for subdivision improvements within the approved grading limits as shown on the approved grading plan. 5) There shall be no disturbance outside of the disturbance/grading limits. Any activity outside of the project boundary may require a construction or maintenance easement and may be required to be reviewed if not already shown on the approved plans. 6) Contact Permits and Codes (837-6606) for any questions regarding City of Tucson right-of-way permit requirements.
03/04/2008 7) If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required. 8) Revisions to the design must be discussed with a Civil Engineer at the City of Tucson Development Services Department Engineering Division, prior to any construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed, or, whether changes may be provided on as-builts. All work completed without approval is subject to Stop Work Order. 9) The permitee shall notify the DSD when the grading operation is ready for final grading inspection. Final grading approval or release of reseed bond shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all permanent erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed. Any revegetated areas shall require Landscaping approval of established vegetation prior to reseed bond release. Any other exposed areas that are not reseeded shall be covered in gravel, unless other material is proposed and reviewed by the City of Tucson. 10) City of Tucson, DSD Grading and Engineering Inspector shall complete a sidewalk and curb and gutter inspection before final grading approval. 11) Special inspections are required for any cut-off walls, and toedowns. 12) Project Engineering and Geotechnical Engineering completion letters, as well as As-Builts are required to be submitted prior to final Grading Inspection. Letters of certification from Engineer of Record for basin function and project substantial completion are required and shall be submitted prior to final grading inspection.
03/04/2008 13) For inspection purposes, post the AZPDES - Posting Requirements green sheet at construction entrances to the site at beginning of construction activities and maintain these posted documents throughout project construction. 14) See the associated Stormwater Pollution Prevention Plan dated 1-2-08 (& 3-4-08: sheet 2) as a part of this grading permit. Interim erosion and sediment controls shall be maintained through out the life of the project per approved grading plans and SWPPP at disturbance limits. 15) Designated concrete washout locations shall not be located in the water harvest or basin area. 16) Temporary erosion and sediment control devices shall be placed at locations where stormwater runoff exits grading limits to prevent debris, construction silt, and/or chemicals from entering any drainage ways that eventually discharge into the receiving waters. Interim erosion and sediment controls shall be maintained per approved grading plans at downstream areas of disturbance limits. 17) The operator shall report to ADEQ any noncompliance (including spills) which may endanger human health or the environment. The operator shall orally notify the office listed below within 24 hours: Arizona Department of Environmental Quality, 1110 W. Washington, 5th floor (5515B-1), Phoenix, AZ 85007, Office: 602-771-4466; Fax 602-771-4505
03/04/2008 18) Stockpile permit T06BU00133 shall be resolved by earthwork for approved improvements to the site. Any permanent erosion and sediment controls including gravel and/or reseeding shall be placed and established prior to release of any bond and prior to any request for final approval.
03/10/2008 19) Reseeding bond in the amount of $60,450.60 is required unless the plans are resubmitted with a request for grading permits for the North Phase or South Phase separately.

Outstanding Inspections

Permit Status: Withdrwn
Permit Number: T05BU01915
Permite Description: GRADING:CUT 11900 FILL 70300
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
NPPO PRE PERMIT INSPECTION N/A Not Inspected
LANDSCAPE INSPECTION N/A Not Inspected
10/21/2011 GRADING - FINAL N/A Not ready for Inspection NO WORK AT THIS TIME, THE STOCKPILE HAS BEEN PLACED, NO CONCERNS AT THIS TIME.

Documents

File Name Document Type  
DRAINAGERPTPART1_01.TIF DOCUMENTS VIEW
DRAINAGERPTPARTR1_02.TIF DOCUMENTS VIEW
DRAINAGERPTPART1_03.TIF DOCUMENTS VIEW
DRAINAGERPTPART2_01.TIF DOCUMENTS VIEW
DRAINAGERPTPART2_02.TIF DOCUMENTS VIEW
DRAINAGERPTPART2_03.TIF DOCUMENTS VIEW
DRAINAGERPTPART2_04.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW