Permit: T04OT01918
Permit Details
Status:
Final
Type:
COMMERCIAL OTHER
Address:
2790 W PLACITA SOMBRA CHULA
Address NEW:
2790 W PLACITA SOMBRA CHULA
Apply Date:
09/23/2004
Applicant:
TRACY HARDY
Description:
FLOODPLAIN USE PERMIT
Contractors:
- BRAXTON GROUP
Outstanding Activity Conditions
Permit Number - T04OT01918
Permit Status: Final
Permit Description: FLOODPLAIN USE PERMIT
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 10/08/2004 | FLOODPLAIN USE PERMIT # T04OT01918 The applicant is authorized to use a portion of the flood hazard area in the City of Tucson, Arizona, on the property described as SOMBRAS DEL CERRO LOT 4. This permit is for the purpose of constructing rock riprap bank protection and key-in in the Camino De Oeste Wash floodplain, in accordance with the approved Tentative Plat for Sombras Del Cerro Lots 1-12 and the construction details submitted with this permit application, sealed by Clinton M. Glass, P.E. The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard Management Regulations (Section 26, Tucson Code), and is particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Management Regulations require the issuance of an additional Floodplain Use Permit. The following conditions apply to this permit: 1) All work shall conform to the approved Tentative Plat for Sombras Del Cerro Lots 1-12, and the construction details sealed by Clinton M. Glass, P.E. referenced above. 2) A copy of this permit and details shall be kept on the job site at all times during construction. 3) Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters. 4) Within 5 (five) days of issuance of this permit, through completion of the project, notification must be posted and maintained in a conspicuous place on the job site stating "CONSTRUCTION PROCEEDING UNDER REQUIREMENTS OF CITY OF TUCSON FLOODPLAIN USE PERMIT # T04OT01918 - FOR INFORMATION PLEASE CALL 791-5550." 5) This permit becomes invalid and is subject to an additional floodplain permit application and review, if any proposed or required modifications result in development within the floodplain other than as approved herewith. This Floodplain Use Permit becomes invalid and will be automatically revoked if development onsite results in non-compliance with conditions set forth in this permit. This permit will expire one year from its date of issue. Renewal of this permit will require a new application, review, and approval by the City of Tucson, Development Services Department, Engineering Division. |
| 10/08/2004 | This permit approval is for bank protection work only. Associated permit activity numbers must be approved prior to any other work onsite |