Permit: T04CM05519
Permit Details
Apply Date:
12/21/2004
Applicant:
W S M ARCHITECTS- JOEL MESIK
Description:
SCHOOL ADDITION: KITCHEN STORAGE 40' x 40' AREA FOR REMODEL AND ADDITION AT EXISTING KITCHEN OF MASONRY W/ WOOD FRAME AND STUCCO, WOOD TRUSS ROOF W/ PLYWOOD DECKING, STEEL LINTELS,AND METAL STUDS W/ GYP BD INTERIOR PARTITIONS
Contractors:
- TUCSON UNIFIED SCHOOL DIST #1
Permit Reviews
Permit Number - T04CM05519
Permit Status: Si_xpire
Permit Description: SCHOOL ADDITION: KITCHEN STORAGE
40' x 40' AREA FOR REMODEL AND ADDITION AT EXISTING KITCHEN OF MASONRY W/ WOOD FRAME AND STUCCO, WOOD TRUSS ROOF W/ PLYWOOD DECKING, STEEL LINTELS,AND METAL STUDS W/ GYP BD INTERIOR PARTITIONS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/10/2005 | RESUBMITTAL | 04/20/2005 | COMPLETED |
| 12/21/2004 | PLANS OK TO SUBMIT - COMM | 12/21/2004 | COMPLETED |
| 12/21/2004 | COMMERCIAL NEW | 02/16/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04CM05519
Permit Status: Si_xpire
Permit Description: SCHOOL ADDITION: KITCHEN STORAGE
40' x 40' AREA FOR REMODEL AND ADDITION AT EXISTING KITCHEN OF MASONRY W/ WOOD FRAME AND STUCCO, WOOD TRUSS ROOF W/ PLYWOOD DECKING, STEEL LINTELS,AND METAL STUDS W/ GYP BD INTERIOR PARTITIONS
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 12/21/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 03/22/2005 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. |
| 03/22/2005 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
| 03/22/2005 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 03/23/2005 | Submit two sets of shop drawings and calculations, stamped and signed by an Arizona Registered engineer, shop drawings shall be reviewed by and bear the approval of the Engineer or Architect of Record prior to submission to the City of Tucson , Development Services Department for approval prior to erection of WOOD ROOF TRUSSES |
Outstanding Inspections
Permit Status: Si_xpire
Permit Number: T04CM05519
Permite Description: SCHOOL ADDITION: KITCHEN STORAGE
40' x 40' AREA FOR REMODEL AND ADDITION AT EXISTING KITCHEN OF MASONRY W/ WOOD FRAME AND STUCCO, WOOD TRUSS ROOF W/ PLYWOOD DECKING, STEEL LINTELS,AND METAL STUDS W/ GYP BD INTERIOR PARTITIONS
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| PERMIT FINALED | N/A | Not Inspected |
Completed Inspections
Permit Status: Si_xpire
Permit Number: T04CM05519
Permit Description: SCHOOL ADDITION: KITCHEN STORAGE
40' x 40' AREA FOR REMODEL AND ADDITION AT EXISTING KITCHEN OF MASONRY W/ WOOD FRAME AND STUCCO, WOOD TRUSS ROOF W/ PLYWOOD DECKING, STEEL LINTELS,AND METAL STUDS W/ GYP BD INTERIOR PARTITIONS
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2005 | ELECTRIC - UNDERGROUND | MCAPISTR | Approved | IVRS - Inspection :* |
| 08/29/2005 | EXCAVATION/LAYOUT REBAR & ZON | AMATHIES | Approved | IVRS - Inspection :* SHEEVE BOTH PIPES CROSSING FTG |
| 10/04/2005 | STEM WALL/RETAINING WALL | AQUIROZ | Approved | IVRS - Inspection :* |
| 11/15/2005 | BUILDING PRE-SLAB | AMATHIES | Approved | IVRS - Inspection :*APPROVED |
| 01/11/2006 | REINFORCED MASONRY PRE-GROUT | AQUIROZ | Approved | IVRS - Inspection :* |
| 02/28/2006 | ROOF NAILING | AQUIROZ | Approved | IVRS - Inspection :* |
| 03/31/2006 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | IVRS - Inspection :* |
| 04/02/2006 | FRAMING | AQUIROZ | Approved | IVRS - Inspection :* |
| 04/04/2006 | SHEET ROCK NAILING | AQUIROZ | Approved | IVRS - Inspection :* |
| 04/12/2006 | OUTDOOR LIGHTING FINAL | CCLEMENS | Approved | IVRS - Inspection :* |
| 04/13/2006 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection :* |
| 04/18/2006 | STUCCO MESH | JCAGLE | Approved | IVRS - Inspection :* |
| 04/26/2006 | ELECTRIC - FINAL | CCLEMENS | Approved | IVRS - Inspection :* |
| 04/26/2006 | FIRE - FINAL | LTHOMAS | Approved | |
| 04/27/2006 | EXT METAL CLIPS/EXT SHEATHING | AQUIROZ | Approved | |
| 04/27/2006 | ELECTRIC - INTERMEDIATE | CCLEMENS | Approved | |
| 04/27/2006 | MECHANICAL - ABOVE CEILING | CWILLIAM | Approved | |
| 04/27/2006 | PLUMBING - FINAL | RMYERS | Approved | 1. P6.0 ONLY PLUMBING IS THE INSTALLATION OF AN EVAPORATIVE COOLER. 2. ALL PLUMBING INSPECTED BY TUSD |
| 04/27/2006 | PLUMBING - INTERMEDIATE | RMYERS | Approved | |
| 04/27/2006 | BUILDING - FINAL | AQUIROZ | Approved | IVRS - Inspection :* |