Permit: T04CM04544
Permit Details
Apply Date:
10/12/2004
Applicant:
METRO PERMIT EXPRESS, INC
Description:
SITE:CAR WASH ADDITION
Outstanding Activity Conditions
Permit Number - T04CM04544
Permit Status: Withdrwn
Permit Description: SITE:CAR WASH ADDITION
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 10/12/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 01/21/2005 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
| 01/21/2005 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Withdrwn
Permit Number: T04CM04544
Permite Description: SITE:CAR WASH ADDITION
Total Outstanding Inspections - 28
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| EXCAVATION/LAYOUT REBAR & ZON | N/A | Not Inspected | ||
| BUILDING PRE-SLAB | N/A | Not Inspected | ||
| REINFORCED MASONRY PRE-GROUT | N/A | Not Inspected | ||
| EXT METAL CLIPS/EXT SHEATHING | N/A | Not Inspected | ||
| ROOF NAILING | N/A | Not Inspected | ||
| BUILDING ABOVE CEILING | N/A | Not Inspected | ||
| STUCCO MESH | N/A | Not Inspected | ||
| U VALUE FOR WINDOW | N/A | Not Inspected | ||
| SHEET ROCK NAILING | N/A | Not Inspected | ||
| BUILDING - PROGRESS | N/A | Not Inspected | ||
| BUILDING - FINAL | N/A | Not Inspected | ||
| ELECTRIC - UNDERGROUND | N/A | Not Inspected | ||
| ELECTRIC - INTERMEDIATE | N/A | Not Inspected | ||
| ELECTRIC - ABOVE CEILING | N/A | Not Inspected | ||
| ELECTRIC - PROGRESS | N/A | Not Inspected | ||
| ELECTRIC - FINAL | N/A | Not Inspected | ||
| PLUMBING - ROUGH, SOIL | N/A | Not Inspected | ||
| PLUMBING - INTERMEDIATE | N/A | Not Inspected | ||
| PLUMBING - ABOVE CEILING | N/A | Not Inspected | ||
| PLUMBING - ROOF DRAINS | N/A | Not Inspected | ||
| PLUMBING - PROGRESS | N/A | Not Inspected | ||
| PLUMBING - FINAL | N/A | Not Inspected | ||
| MECHANICAL - INTERMEDIATE | N/A | Not Inspected | ||
| MECHANICAL - FINAL | N/A | Not Inspected | ||
| FIRE - FINAL | N/A | Not Inspected | ||
| ENGINEERING - FINAL | N/A | Not Inspected | ||
| SIGN - FINAL | N/A | Not Inspected | ||
| RIGHT OF WAY - FINAL | N/A | Not Inspected |