Permit: T04CM03596
Permit Details
Apply Date:
08/04/2004
Applicant:
OGAS ANDREW
Description:
TI:CHURCH BATHROOM AREA
Contractors:
- ENVIRONMENTAL STRATEGIES INC ,
Permit Reviews
Permit Number - T04CM03596
Permit Status: Expired
Permit Description: TI:CHURCH BATHROOM AREA
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/04/2004 | COMMERCIAL TI | 08/13/2004 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04CM03596
Permit Status: Expired
Permit Description: TI:CHURCH BATHROOM AREA
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/04/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T04CM03596
Permite Description: TI:CHURCH BATHROOM AREA
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| BUILDING - FINAL | N/A | Not Inspected | ||
| ELECTRIC - FINAL | N/A | Not Inspected | ||
| PLUMBING - FINAL | N/A | Not Inspected | ||
| FIRE - FINAL | N/A | Not Inspected | ||
| 01/07/2005 | PLUMBING - PROGRESS | N/A | Not ready for Inspection | IVRS - Inspection :*/1)PLEASE CALL ONLY WHEN READY. PLEASE COMPLETE WATER PIPING & WASTE PIPING TO PLAN PROVIDE NAIL PROTECTION. CALL AGAIN |
| 04/22/2005 | SIGN - FINAL | N/A | Denied | IVRS - Inspection : The occupancy inspection reveals that corrections are required. Please furni |
| 04/25/2005 | ENGINEERING - FINAL | N/A | Partial Approval | C OF O APPROVED. |
Completed Inspections
Permit Status: Expired
Permit Number: T04CM03596
Permit Description: TI:CHURCH BATHROOM AREA
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/07/2004 | PLUMBING - ROUGH, SOIL | TRINIVJR | Approved | IVRS - Inspection :*/1)SOIL WATER TEST IS OK 2)P.O.C. OF NEW BLDG. DRAIN TO EXSISTING BLDG DRAIN IS OK 3)NOTE: SHALL RED LINE APPROVED DRAWING SHOWING WET VENT FOR LAVATORY 4)OK TO BACKFILL TRENCH |
| 10/29/2004 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :*/WASTE & VENT IN WALL THRU ROOF WATER TEST OK. H2O PIPING IN WALL FOR REST ROOM WATER TEST OK. 1)DO NOT COVER COILING AREA IN EAST ROOM UNTIL WATER PIPING OVERHEAD IS COMPLETE. 2)INSTALL CLOSET FLANGES BEFORE SETTING STOOL AND PROVIDE VIEWING. 3) HAVE PLAN REVISED TO SHOW WATER HEATER NEW LOCATION AND H2O DISTRIBUTION OF ACTUAL INSTALLATION 4)PROVIDE PROPER CAPPING OF ALL DEMEED FIXTURES AND VIEWING BEFORE COVERING |
| 10/29/2004 | ELECTRIC - INTERMEDIATE | RSUBA | Approved | |
| 10/29/2004 | FRAMING | RSUBA | Approved | IVRS - Inspection :* |
| 10/29/2004 | ELECTRIC - ABOVE CEILING | RSUBA | Approved | IVRS - Inspection :* |
| 03/16/2005 | SHEET ROCK NAILING | AQUIROZ | Approved | IVRS - Inspection :* |
| 04/22/2005 | BUILDING ABOVE CEILING | AMATHIES | Approved | IVRS - Inspection :* |
| 04/25/2005 | RIGHT OF WAY - FINAL | PWHIDDON | Approved | CLEAR |