Permit: T04BU02354
Permit Details
Apply Date:
09/23/2004
Applicant:
O P W ENGINEERING L L C
Description:
GRADING:4800CY CUT & 2600CY FILL
Contractors:
- SUNLAND INC ASPHALT AND SEALCOAT
Permit Reviews
Permit Number - T04BU02354
Permit Status: Closed
Permit Description: GRADING:4800CY CUT & 2600CY FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/28/2005 | RESUBMITTAL - GRADING ALL | 06/28/2005 | COMPLETED |
| 09/23/2004 | PLANS OK TO SUBMIT - GRADING | 09/23/2004 | COMPLETED |
| 09/30/2004 | GRADING | 11/04/2004 | COMPLETED |
| 11/23/2004 | GRADING | 12/29/2004 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04BU02354
Permit Status: Closed
Permit Description: GRADING:4800CY CUT & 2600CY FILL
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 09/23/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 02/04/2005 | All work must be in compliance with Floodplain Use Permit T04OT02298 |
Outstanding Inspections
Permit Status: Closed
Permit Number: T04BU02354
Permite Description: GRADING:4800CY CUT & 2600CY FILL
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2006 | LANDSCAPE INSPECTION | N/A | Not ready for Inspection | Landscape per approved must be installed prior to inspection. |
| 06/18/2020 | GRADING - CHECK FOR ACTIVITY | N/A | Not ready for Inspection | NOT READY THIS SITE HAS NOT BEEN CONSTRUCTED PER THE APPROVED, ADDITIONAL COMMENTS TO BE MADE ONCE THE PLANS HAVE BEEN FULLY REVIEWED. |
| 12/12/2007 | GRADING - FINAL | N/A | Denied | This is a preliminary punch list. NOT A FINAL. Contractor needs to: 1- Provide letter from engineer in regards to C.O.T Drainage Manual, chapter XIV, section 14.2 (7). 2- Provide C.O.T. Engineering and Zoning revised drawings showing all changes to site. 3- Basin not built per approved drawing. 4- Landscape islands not built per approved drawings. 5- Parking spaces not installed per approved drawings. 6- Basin inlet not built per approved drawings. 7- PAALs not per approved drawings. 8- H.C. parking not installed per approved drawings. 9- Clean wash out from basin. 10- Once contractor has an approved revised set of drawings call in for final inspection. THIS IS NOT A FINAL PUNCH LIST. CONTRACTOR NEEDS TO PROVIDE APPROVED REVISED DRAWINGS BEFORE FINAL INSPECTION!!!! |
| 12/28/2005 | STORMWATER FOLLOW-UP INSP | N/A | Correction Required | Site unchanged from last inspection. |
Completed Inspections
Permit Status: Closed
Permit Number: T04BU02354
Permit Description: GRADING:4800CY CUT & 2600CY FILL
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2005 | STORMWATER INSTALL OF CONTROLS | MAVERY | Approved | Contractor has installed waddles. |