Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address NEW:
7250 E VOYAGER RD
Apply Date:
09/20/2004
Applicant:
STANTEC /WARREN THOMPSON
Description:
GRADING: CUT 4,880 CY FILL 11,530 CY VLG 7 LOTS 1-25 LENNAR HOMES
Contractors:
  • STANTEC
  • U S HOME OF ARIZONA *P *C

Permit Reviews

Permit Number - T04BU02324
Permit Status: Final
Permit Description: GRADING: CUT 4,880 CY FILL 11,530 CY VLG 7 LOTS 1-25 LENNAR HOMES
Start Date Submittal Complete Date Status  
09/20/2004 PLANS OK TO SUBMIT - GRADING 09/20/2004 COMPLETED Review Details
09/21/2004 GRADING 10/22/2004 COMPLETED Review Details
11/24/2004 RESUBMITTAL - GRADING ALL 04/21/2005 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T04BU02324
Permit Status: Final
Permit Description: GRADING: CUT 4,880 CY FILL 11,530 CY VLG 7 LOTS 1-25 LENNAR HOMES
Total Outstanding Activity Conditions - 1
Date Name
09/20/2004 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T04BU02324
Permit Description: GRADING: CUT 4,880 CY FILL 11,530 CY VLG 7 LOTS 1-25 LENNAR HOMES
Total Completed Inspections - 7
Date Description Inspector Results Comments
03/15/2005 NPPO PRE PERMIT INSPECTION ACONNOR Approved
12/19/2005 STORMWATER FOLLOW-UP INSP NKALAHAR Approved BASIN ROUGH GRADED
SWPPP ALONG E SIDE APPEARS TO BE WORKING
11/23/2007 LANDSCAPE INSPECTION ACONNOR Approved Verify that all of Engineering comments and concerns are addressed.

Monitoring report requested as to disposition of disposition of PIP, TOS, and required mitigation, as shown in the NPPO summary.
12/21/2007 GRADING - FINAL NKALAHAR Approved MET ONSITE WITH DAVE, NICOLE AND SEAN

SLOPES NOT PER PLAN
MUST BE ADDRESSED BY EOR AND CITY REVIEW ENGINEER
05/16/2008 STORMWATER INSTALL OF CONTROLS NKALAHAR Approved
05/16/2008 ENGINEERING PRE-CONSTRUCTION NKALAHAR Approved
05/21/2008 PERMIT FINALED BGRANT Approved

Documents

File Name Document Type  
TUC-ECOPY5_LNOTESMAIL_05132008-115404.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
None IMAGES VIEW