Permit: T04BU02233
Permit Details
Apply Date:
09/09/2004
Applicant:
KACEY CARLETON
Description:
GRADING:3500CY CUT & FILL 13000CY BOND RELEASE PER BETH G 11/15/06
Contractors:
- TUCSON UNIFIED SCHOOL DIST #1
Permit Reviews
Permit Number - T04BU02233
Permit Status: Final
Permit Description: GRADING:3500CY CUT & FILL 13000CY
BOND RELEASE PER BETH G 11/15/06
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/09/2004 | PLANS OK TO SUBMIT - GRADING | 09/09/2004 | COMPLETED |
09/09/2004 | GRADING | 10/11/2004 | COMPLETED |
10/26/2004 | RESUBMITTAL - GRADING ALL | 12/02/2004 | COMPLETED |
12/02/2004 | RESUBMITTAL - GRADING | 12/14/2004 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04BU02233
Permit Status: Final
Permit Description: GRADING:3500CY CUT & FILL 13000CY
BOND RELEASE PER BETH G 11/15/06
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/09/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T04BU02233
Permit Description: GRADING:3500CY CUT & FILL 13000CY
BOND RELEASE PER BETH G 11/15/06
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/31/2005 | ENGINEERING PRE-CONSTRUCTION | JBRUCKME | Approved | PRE-CON MEETING WITH CONCORD GENERAL CONSTRUCION SUPT. DARELL CONKLIN 419-4467 CALL FOR INSPECTION OF INSTALLATION OF SW CONTROLS. |
02/18/2005 | STORMWATER INSTALL OF CONTROLS | JBRUCKME | Approved | |
12/01/2005 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | 1) RE-ESTABLISH STABILIZED CONSTRUCTION ENTRANCES. 2) SWEEP UP ANY TRACKED MATERIAL OFF OF PUBLIC ROADWAYS. 3) REPAIR AND/OR REPLACE SECTIONS OF SILT FENCE ALONG THE EAST BOUNDRY OF THE SITE. 4) SEDIMENT CONTROLS MUST REMAIN IN PLACE UNTIL THE SITE IS 100% STABILIZED. 5) CALL A MIN. OF TWO WEEKS PRIOR TO THE EXPECTED C OF O DATE SO THAT AN INSPECTION CAN BE ACCOMPLISHED AND ANY PUNCHLIST ITEMS CAN BE ADDRESSED. |
11/07/2006 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | |
11/07/2006 | GRADING - FINAL | MRUSSO | Approved |