Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Apply Date:
09/09/2004
Applicant:
KACEY CARLETON
Description:
GRADING:3500CY CUT & FILL 13000CY BOND RELEASE PER BETH G 11/15/06
Contractors:
  • TUCSON UNIFIED SCHOOL DIST #1

Permit Reviews

Permit Number - T04BU02233
Permit Status: Final
Permit Description: GRADING:3500CY CUT & FILL 13000CY BOND RELEASE PER BETH G 11/15/06
Start Date Submittal Complete Date Status  
09/09/2004 PLANS OK TO SUBMIT - GRADING 09/09/2004 COMPLETED Review Details
09/09/2004 GRADING 10/11/2004 COMPLETED Review Details
10/26/2004 RESUBMITTAL - GRADING ALL 12/02/2004 COMPLETED Review Details
12/02/2004 RESUBMITTAL - GRADING 12/14/2004 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T04BU02233
Permit Status: Final
Permit Description: GRADING:3500CY CUT & FILL 13000CY BOND RELEASE PER BETH G 11/15/06
Total Outstanding Activity Conditions - 1
Date Name
09/09/2004 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T04BU02233
Permit Description: GRADING:3500CY CUT & FILL 13000CY BOND RELEASE PER BETH G 11/15/06
Total Completed Inspections - 5
Date Description Inspector Results Comments
01/31/2005 ENGINEERING PRE-CONSTRUCTION JBRUCKME Approved PRE-CON MEETING WITH CONCORD GENERAL CONSTRUCION SUPT. DARELL CONKLIN 419-4467
CALL FOR INSPECTION OF INSTALLATION OF SW CONTROLS.
02/18/2005 STORMWATER INSTALL OF CONTROLS JBRUCKME Approved
12/01/2005 STORMWATER FOLLOW-UP INSP MRUSSO Approved 1) RE-ESTABLISH STABILIZED CONSTRUCTION ENTRANCES.
2) SWEEP UP ANY TRACKED MATERIAL OFF OF PUBLIC ROADWAYS.
3) REPAIR AND/OR REPLACE SECTIONS OF SILT FENCE ALONG THE EAST BOUNDRY OF THE SITE.
4) SEDIMENT CONTROLS MUST REMAIN IN PLACE UNTIL THE SITE IS 100% STABILIZED.
5) CALL A MIN. OF TWO WEEKS PRIOR TO THE EXPECTED C OF O DATE SO THAT AN INSPECTION CAN BE ACCOMPLISHED AND ANY PUNCHLIST ITEMS CAN BE ADDRESSED.
11/07/2006 STORMWATER FINAL INSPECTION MRUSSO Approved
11/07/2006 GRADING - FINAL MRUSSO Approved