Permit: T04BU02065
Permit Details
Apply Date:
08/19/2004
Applicant:
N/A
Description:
GRADING:0 CY CUT/1000 CY FILL
Contractors:
- D K B CONSTRUCTION ,
Permit Reviews
Permit Number - T04BU02065
Permit Status: Final
Permit Description: GRADING:0 CY CUT/1000 CY FILL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/19/2004 | PLANS OK TO SUBMIT - GRADING | 08/19/2004 | COMPLETED |
08/19/2004 | GRADING | 09/21/2004 | COMPLETED |
11/26/2004 | RESUBMITTAL - GRADING ALL | 12/28/2004 | COMPLETED |
12/29/2004 | RESUBMITTAL - GRADING | 12/29/2004 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T04BU02065
Permit Description: GRADING:0 CY CUT/1000 CY FILL
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/05/2005 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
12/02/2005 | GRADING - FINAL | NKALAHAR | Approved | 1. SIDEWALK SCUPPERS HAVE NOT BEEN INSTALLED AS CALLED OUT IN KEY NOTE #28-(#31 ON UNSTAMPED REVISED PLANS STEVE KOCH HAD AT MEET) 2. 3 214' RUNS OF DRAINAGE PIPE NOT INSTALLED AS CALLED OUT IN KEY NOTE #31-THESE PIPES ARE NOT ON REVISED SET OF PLANS 3. ADDITIONAL TERMINAL CURB INSTALLED WITH RIP RAP GIVING DRAINAGE TO DETENTION BASIN ON WEST SIDE OF PROPERTY NOT CALLED OUT ON PLANS. CHANGE MUST BE APPROVED BY ENGINEER AND REVIEWED BY COT. ?? ON NEW PLANS 4. CURB AT WEST SIDE OF NORTH DRIVEWAY HAS BEEN SAW CUT AND RIP RAP ADDED FOR DRAINAGE NORTH TO EXISTING DETENTION BASIN NOT CALLED OUT IN PLANS. CHANGE MUST BE APPROVED BY ENGINEER AND REVIEWED BY COT. ?? SHOWN ON REVISED PLANS 5. ALL NEW RETENTION/DETENTION FACILITIES MUST HAVE A LETTER OF CERTIFICATION SUBMITTED TO COT. 6. TRUNCATED DOMES NOT INSTALLED. STEVE KOCH TO GET BASIN CERTIFICATION LETTER. COBRE DEVELOPMENT (TIM OR JOHN 882-8010) MAY NEED TO ASSIST FOR ADDITIONAL SITE WORK INCLUDING POSSIBLE REGRADE OF BASINS AND HYDROSEED OF SITE WHERE SOIL HAS BEEN DISTURBED AND NOT STABILIZED. |
12/16/2005 | STORMWATER FOLLOW-UP INSP | NKALAHAR | Approved | NO CONCERNS/CHANGES TO THE SITE |
01/13/2006 | LANDSCAPE INSPECTION | ACONNOR | Approved | |
01/17/2006 | STORMWATER FINAL INSPECTION | NKALAHAR | Approved | |
01/18/2006 | PERMIT FINALED | DROBEY | Approved | |
01/18/2006 | STORMWATER INSTALL OF CONTROLS | LMAKUS | Approved | |
01/18/2006 | ENGINEERING PRE-CONSTRUCTION | LMAKUS | Approved |