Permit: T04BU01881
Permit Details
Apply Date:
07/30/2004
Applicant:
RICK ENGINEERING
Description:
GRADING:500 CY CUT & 1000 CY FILL
Contractors:
- GILES CONSTRUCTION INC
Permit Reviews
Permit Number - T04BU01881
Permit Status: Expired
Permit Description: GRADING:500 CY CUT & 1000 CY FILL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/01/2005 | REVISION - GRADING | 06/01/2005 | COMPLETED |
07/30/2004 | PLANS OK TO SUBMIT - GRADING | 07/30/2004 | COMPLETED |
07/30/2004 | GRADING | 08/23/2004 | COMPLETED |
09/15/2004 | RESUBMITTAL - GRADING ALL | 10/12/2004 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04BU01881
Permit Status: Expired
Permit Description: GRADING:500 CY CUT & 1000 CY FILL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/30/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T04BU01881
Permite Description: GRADING:500 CY CUT & 1000 CY FILL
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/07/2008 | STORMWATER FINAL INSPECTION | N/A | Denied | Need to address south west corner of building. |
08/07/2008 | GRADING - FINAL | N/A | Denied | Provide approved drawing for inspection. None working number listed for owner. |
Completed Inspections
Permit Status: Expired
Permit Number: T04BU01881
Permit Description: GRADING:500 CY CUT & 1000 CY FILL
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/01/2004 | ENGINEERING PRE-CONSTRUCTION | JSALINE | Approved | NO ACTIVITY ON THIS SITE AT THIS TIME. RESCHEDULED FOR ON MONTH. |
11/10/2004 | STORMWATER INSTALL OF CONTROLS | JSALINE | Approved | 1) ADDRESS STOCK PILES AND PROVIDE A CRUST TO PREVENT DUST FLOW. 2) EXTEND SILT-FENCING TO BACK OF STOCK PILES. 3) CONSTRUCT A CONCRETE WASH-OUT AREA. 4) POST AZPDES FORM PROVIDED BY THE ISPECTOR PER AZPDES - POSTING REQUIREMENTS. CONTRACTOR IS BILL OGLE WITH "GILES" (409-6631). |
08/07/2008 | STORMWATER FOLLOW-UP INSP | MAVERY | Approved |