Permit Details

Status:
Closed
Type:
SIDEWALK INSTALLATION
Apply Date:
07/29/2003
Applicant:
B F L CONSTRUCTION CO INC ,
Description:
EXCAV:CLOSE EXIS DRIVEWAY/PLACE SIDEWALK/CURB 60LF
Contractors:
  • B F L CONSTRUCTION CO INC ,

Outstanding Activity Conditions

Permit Number - T03EX00819
Permit Status: Closed
Permit Description: EXCAV:CLOSE EXIS DRIVEWAY/PLACE SIDEWALK/CURB 60LF
Total Outstanding Activity Conditions - 2
Date Name
07/29/2003 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
07/29/2003 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.