Permit Details

Status:
Withdrwn
Type:
COMMERCIAL NEW
Address:
2474 E RIVER RD
Apply Date:
12/22/2003
Applicant:
METRO PERMIT EXPRESS, INC
Description:
NEW:OFFICE
Architects:
  • EGLIN, EVAN SAR

Permit Reviews

Permit Number - T03CM05836
Permit Status: Withdrwn
Permit Description: NEW:OFFICE
Start Date Submittal Complete Date Status  
01/29/2004 3RD PARTY REVIEW-COMMERCIAL 03/05/2004 COMPLETED Review Details
02/05/2004 PLANS OK TO SUBMIT - SITE 02/09/2004 COMPLETED Review Details
02/09/2004 SITE 03/15/2004 STOPPED Review Details
03/05/2004 RESUBMITTAL 03/15/2004 STOPPED Review Details
12/22/2003 PLANS OK TO SUBMIT - 3RD PARTY 12/22/2003 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T03CM05836
Permit Status: Withdrwn
Permit Description: NEW:OFFICE
Total Outstanding Activity Conditions - 9
Date Name
12/22/2003 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
02/18/2004 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
02/18/2004 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
02/18/2004 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
02/18/2004 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
02/18/2004 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
02/18/2004 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/18/2004 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
05/03/2004 Adherence to rezoning conditions is required prior to issuance of Certificate of Occupancy.

Outstanding Inspections

Permit Status: Withdrwn
Permit Number: T03CM05836
Permite Description: NEW:OFFICE
Total Outstanding Inspections - 37
Last Inspection Date Description Inspector Results Comments
EXCAVATION/LAYOUT REBAR & ZON N/A Not Inspected
REINFORCED MASONRY PRE-GROUT N/A Not Inspected
EXT METAL CLIPS/EXT SHEATHING N/A Not Inspected
ROOF NAILING N/A Not Inspected
FRAMING N/A Not Inspected
STUCCO MESH N/A Not Inspected
U VALUE FOR WINDOW N/A Not Inspected
SHEET ROCK NAILING N/A Not Inspected
BUILDING - FINAL N/A Not Inspected
ELECTRIC - UFER N/A Not Inspected
ELECTRIC - INTERMEDIATE N/A Not Inspected
ELECTRIC - ABOVE CEILING N/A Not Inspected
ELECTRIC - CABLE DROP N/A Not Inspected
ELECTRIC - TEMPORARY SERVICE N/A Not Inspected
ELECTRIC - FINAL N/A Not Inspected
OUTDOOR LIGHTING FINAL N/A Not Inspected
PLUMBING - ROUGH, SOIL N/A Not Inspected
PLUMBING - INTERMEDIATE N/A Not Inspected
PLUMBING - ABOVE CEILING N/A Not Inspected
PLUMBING - ROOF DRAINS N/A Not Inspected
PLUMBING - YARD WTR LINE/TEST N/A Not Inspected
PLUMBING - GAS PRESSURE TEST N/A Not Inspected
PLUMBING - GAS PRESS TEST FNL N/A Not Inspected
PLUMBING - SEWER HCS CONNECT N/A Not Inspected
PLUMBING - FINAL N/A Not Inspected
MECHANICAL - INTERMEDIATE N/A Not Inspected
MECHANICAL - ABOVE CEILING N/A Not Inspected
MECHANICAL - FINAL N/A Not Inspected
FIRE SPKLR - UG, PIPING, HYDRO N/A Not Inspected
FIRE SPKLR - UG PIPING FLUSH N/A Not Inspected
FIRE SPKLR - OH PIPING & HYDRO N/A Not Inspected
FIRE SPKLR - FINAL N/A Not Inspected
FIRE - FINAL N/A Not Inspected
ENGINEERING - FINAL N/A Not Inspected
LANDSCAPE - FINAL N/A Not Inspected
SIGN - FINAL N/A Not Inspected
RIGHT OF WAY - FINAL N/A Not Inspected