Permit: T03CM05202
Permit Details
Status:
Final
Type:
SINGLE FAMILY ALTERATION
Address:
8014 S NEW ABBEY DR
Address NEW:
8014 S NEW ABBEY DR
Apply Date:
10/31/2003
Applicant:
SHADER WILLIAM G & SUSAN L JT/RS
Description:
ENCLOSE:PORCH TO AZ ROOM
Permit Reviews
Permit Number - T03CM05202
Permit Status: Final
Permit Description: ENCLOSE:PORCH TO AZ ROOM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/31/2003 | RESIDENTIAL BLDG/ENGINE/WALK THRU | 11/12/2003 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T03CM05202
Permit Status: Final
Permit Description: ENCLOSE:PORCH TO AZ ROOM
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/31/2003 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T03CM05202
Permit Description: ENCLOSE:PORCH TO AZ ROOM
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/26/2003 | ELECTRIC - INTERMEDIATE | HCAMPBEL | Approved | IVRS - Inspection 0999*/ 1) 18" BELOW GRADE AT CONDUIT 2) NAIL PLATE ELECTRIC. 3) STAPLE ELECTRICAL 4) GROUND METAL BOXES. |
| 12/26/2003 | FRAMING | HCAMPBEL | Approved | IVRS - Inspection 0999*/ 1) 16" ON CENTER AT STUDS. 2) CRIPPLE HEADER AT WEST. 3) SHIM STUDS AND HEADERS. 4) INSTALL AB'S WITHIN 12" OF ENDS. 5) SECURE POST NEAR ENTRY @ WALL. nOTE: SLEEPING AREA IN "EXISTING" WILL REQUIRE EGRESS. |
| 12/26/2003 | EXT METAL CLIPS/EXT SHEATHING | HCAMPBEL | Approved | IVRS - Inspection 0999*/ 1) NAIL EXTERIOR SHEATHING PER CODE. 2) CABIN TIE AT CORNERS. 3) H 2.5 HEADER AND KINGS. |
| 01/06/2004 | U VALUE FOR WINDOW | HPEDROZA | Approved | IVRS - Inspection 0000* |
| 01/30/2004 | STUCCO MESH | HPEDROZA | Approved | IVRS - Inspection 0000* |
| 02/11/2004 | PERMIT FINALED | HPEDROZA | Approved | |
| 02/11/2004 | MECHANICAL - FINAL | HPEDROZA | Approved | IVRS - Inspection 0000* |
| 02/11/2004 | MECHANICAL - INTERMEDIATE | HPEDROZA | Approved | |
| 02/11/2004 | ELECTRIC - FINAL | HPEDROZA | Approved | IVRS - Inspection 0000*SENT TO TEP 2/13/04 AM |
| 02/11/2004 | BUILDING - FINAL | HPEDROZA | Approved | IVRS - Inspection 0000* |