Permit: T03CM01300
Permit Details
Apply Date:
03/14/2003
Applicant:
PHILL MACKEY
Description:
TI:RETAIL
Contractors:
- CORONA SIERRA INC ,
Permit Reviews
Permit Number - T03CM01300
Permit Status: C of o
Permit Description: TI:RETAIL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/14/2003 | PLANS OK TO SUBMIT - COMM | 03/14/2003 | COMPLETED |
03/14/2003 | 3RD PARTY REVIEW-COMMERCIAL TI | 03/21/2003 | COMPLETED |
03/21/2003 | REVISION | 04/02/2003 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T03CM01300
Permit Status: C of o
Permit Description: TI:RETAIL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
03/14/2003 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T03CM01300
Permit Description: TI:RETAIL
Total Completed Inspections - 16
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/18/2003 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection 0000*N/H DWV INSTALLED PER PLAN. COPPER OK POINTS OF CONNECTION OK OK TO COVER. |
04/18/2003 | ELECTRIC - INTERMEDIATE | RMAJUTA | Approved | IVRS - Inspection 0000* 1.) 30A 2P CIR WITH #10'S NEAR HAND SINK NOT IN 2.) DD 16,18 30 A CIR NOT IN FOR COOLER. 3.) NORTH WALL PLAN SHOWS 4 RECEPTACLE ONLY. 2 INSTALLED PLASTER RINGS ONLY SINGLE NOTE 1.) WATER HEATER CIRCUIT CHANGED TO 120V 2.) COOLER CHANGED TO 120V 3.) PLASTER RINGS FOR 4 RECEPTACLES CHANGED OUT. 4.) WILL NEED TO SEE HOW CIRCUITLY RUN IN CEILING. |
04/23/2003 | ELECTRIC - FINAL | MCAPISTR | Approved | IVRS - Inspection 0000* |
04/23/2003 | ELECTRIC - ABOVE CEILING | MCAPISTR | Approved | |
04/23/2003 | FRAMING | HLEYVA | Approved | |
04/24/2003 | PLUMBING - FINAL | RMYERS | Approved | CORRECTIONS MADE OK 2.) OK FOR C OF O PENDING ANY OTHER INSPECTION. |
04/24/2003 | PLUMBING - FINAL | RMYERS | Approved | IVRS - Inspection 0999*1.) NOTICE THAT SINKS ARE PLUGGED. 2.) NOTICE THAT THERE ARE SEVERAL LEAKS WET SPOTS IN CABINET. 3.) T & P RELIEF DRAIN TO BE FULL SIZE. 4.) BAR SINK NOT SECURED. 5.) SINKS NOT CAULKED. |
04/24/2003 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | |
04/24/2003 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection 0000*STEEL CURTAIN BEAM MODIFIED TO HANG FROM EXISTING SOFFITS. STRUCTURAL OK. |
04/24/2003 | BUILDING ABOVE CEILING | LHANLY | Approved | |
05/01/2003 | RIGHT OF WAY - FINAL | MOTERO | Approved | |
05/01/2003 | ENGINEERING - FINAL | JBRUCKME | Approved | |
05/01/2003 | FIRE - FINAL | JEGAN | Approved | IVRS - Inspection 0000* |
05/01/2003 | FIRE SPKLR - FINAL | JEGAN | Approved | IVRS - Inspection 0000* |
05/02/2003 | PERMIT FINALED | JYBARRA | Approved | |
05/02/2003 | SIGN - FINAL | JYBARRA | Approved |