Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Apply Date:
10/09/2002
Applicant:
N/A
Description:
GRADING:CUT 2000 & FILL 10000
Contractors:
  • TRIUMPH BUILDERS SOUTHWEST LLC *C*

Permit Reviews

Permit Number - T02BU02652
Permit Status: Final
Permit Description: GRADING:CUT 2000 & FILL 10000
Start Date Submittal Complete Date Status  
01/08/2003 REVISION 01/08/2003 COMPLETED Review Details
10/09/2002 GRADING 10/28/2002 COMPLETED Review Details
11/01/2002 GRADING 11/01/2002 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T02BU02652
Permit Status: Final
Permit Description: GRADING:CUT 2000 & FILL 10000
Total Outstanding Activity Conditions - 1
Date Name
10/09/2002 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T02BU02652
Permit Description: GRADING:CUT 2000 & FILL 10000
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/01/2002 NPPO PRE PERMIT INSPECTION PGILBERT Approved
11/26/2003 GRADING - FINAL DROBERTS Approved THE WORK ON THIS SITE HAS ONLY BEEN COMPLETED IN THE PHASE 2 PORTION AT THIS TIME. A RELEASE OF THE BOND ON THIS SITE CAN NOT TAKE PLACE UNTIL THE WORK IS COMPLETED PER THE APPROVED PLANS. A RELEASE OF THE GRADING RESEEDING BOND CAN NOT HAPPEN UNTIL ANOTHER BOND IS PUT INTO ITS PLACE. THE FOLLOWING ISSUES STILL REMAIN ACTIVE ON THIS SITE:
1) ON THE WEST SIDE OF THIS BUILDING NEAR THE MAIN ENTRANCE, A ROOF DRAIN STILL DEPOSITS WATER ONTO THE SIDEWALK. IT WAS DISCUSSED PREVIOUSLY THAT THIS WATER NEEDED TO BE DEPOSITED INTO EITHER A PLANTING AREA OR TAKEN DIRECTLY TO THE PARKING LOT.
2) ADJACENT TO THE QUIZNO'S ENTRANCE A ROOF DRAIN REMAINS ACTIVE AND DEPOSITS WATER ONTO THE SIDEWALK. PREVIOUSLY IT WAS DISCUSSED THAT THIS SITE ALONG WITH OTHERS WERE TO BE CHANNELED SO THAT THE WATER WAS DEPOSITED DIRECTLY INTO THE PARKING LOT. THE ONLY ROOF DRAINS THAT DID NOT HAVE TO MAINTAIN THIS CRITERION WERE THE DRAINS THAT FELL WITHIN THE PRIVATE PATIO AREAS.
3) ADJACENT TO THE LOADING ZONE SOUTH OF BUILDING 3 DERTERIORATED PAVEMENT HAS BEEN NOTED. PREVIOUSLY IN THIS AREA STANDING WATER HAS BEEN NOTED TO POND FOR 2 TO 3 DAYS PRIOR TO EVAPORATING.
4) THE 2ND REENTION/DETENTION BASIN SOUTH OF COPPER STREET DOES NOT DRAIN CORRECTLY. STANDING WATER HAS BEEN NOTED IN THIS BASIN AFTER LOCAL RAINS FOR MORE THAN THE ALLOTED TIME FRAME.
09/20/2006 PERMIT FINALED NKALAHAR Approved

Documents

File Name Document Type  
None DOCUMENTS VIEW
PAGE1.TIF GRADING PLANS VIEW
PAGE2.TIF GRADING PLANS VIEW
PAGE3.TIF GRADING PLANS VIEW
PAGE4.TIF GRADING PLANS VIEW
PAGE5.TIF GRADING PLANS VIEW
PAGE6.TIF GRADING PLANS VIEW
PAGE7.TIF GRADING PLANS VIEW
PAGE8.TIF GRADING PLANS VIEW
PAGE9.TIF GRADING PLANS VIEW
PAGE10.TIF GRADING PLANS VIEW
PAGE11.TIF GRADING PLANS VIEW
PAGE12.TIF GRADING PLANS VIEW