Permit: T01PL00559
Permit Details
Apply Date:
03/08/2001
Applicant:
ACTION PIPELINE CONTRACTORS *C
Description:
UNDERGROUND WATER LINE:INSTALL (APA)
Contractors:
- ACTION PIPELINE CONTRACTORS *C
Outstanding Activity Conditions
Permit Number - T01PL00559
Permit Status: Final
Permit Description: UNDERGROUND WATER LINE:INSTALL (APA)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/08/2001 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T01PL00559
Permit Description: UNDERGROUND WATER LINE:INSTALL (APA)
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/16/2001 | PLUMBING - FINAL | MTESTER | Approved | IVRS - Inspection 0000*/1. (57') FIFTY SEVEN FEET OF 1" P.V.C. PIPING INSTALLED. 2. (9') NINE FEET OF 3/4" COPPER PIPING INSTALLED. 3. TRENCH DEPTH: 13+INCHES. 4. WATER PRESSURE: 50 PSI. 5. (2) TWO ANTI SIPHON DEVICES INSTALLED. 6. ELECT. SERVICE GROUNDING ELECTRODE CONDUCTOR IS BONDED TO THE WATER LINE. POSSIBLY HAS 1 GROUND ROD. |