Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T01CM06095
Permit Details
Apply Date:
12/18/2001
Applicant:
ROB PAULUS
Description:
SFR:TD#15-21-92
Contractors:
- FAMOSA MASONRY ,
Permit Reviews
Permit Number - T01CM06095
Permit Status: Withdrwn
Permit Description: SFR:TD#15-21-92
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/18/2001 | RESIDENTIAL BLDG/ZONING/FLOOD | 08/09/2002 | STOPPED |
Outstanding Activity Conditions
Permit Number - T01CM06095
Permit Status: Withdrwn
Permit Description: SFR:TD#15-21-92
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 12/18/2001 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 02/15/2006 | SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE. THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. |
| 02/15/2006 | FINAL ELEVATION CERTIFICATE REQUIRED: AN ORIGINAL FINAL ELEVATION CERTIFICATE SEALED BY A REGISTERED LAND SURVEYOR IS REQ'D. MAIL ELEVATION CERTIFICATE TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER IT TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. THIS CONDITION APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. |
Outstanding Inspections
Permit Status: Withdrwn
Permit Number: T01CM06095
Permite Description: SFR:TD#15-21-92
Total Outstanding Inspections - 23
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| EXCAVATION/LAYOUT REBAR & ZON | N/A | Not Inspected | ||
| STEM WALL/RETAINING WALL | N/A | Not Inspected | ||
| BUILDING PRE-SLAB | N/A | Not Inspected | ||
| REINFORCED MASONRY PRE-GROUT | N/A | Not Inspected | ||
| ROOF NAILING | N/A | Not Inspected | ||
| FRAMING | N/A | Not Inspected | ||
| U VALUE FOR WINDOW | N/A | Not Inspected | ||
| SHEET ROCK NAILING | N/A | Not Inspected | ||
| BUILDING - FINAL | N/A | Not Inspected | ||
| ELECTRIC - UFER | N/A | Not Inspected | ||
| ELECTRIC - INTERMEDIATE | N/A | Not Inspected | ||
| ELECTRIC - CABLE DROP | N/A | Not Inspected | ||
| ELECTRIC - TEMPORARY SERVICE | N/A | Not Inspected | ||
| ELECTRIC - FINAL | N/A | Not Inspected | ||
| PLUMBING - ROUGH, SOIL | N/A | Not Inspected | ||
| PLUMBING - INTERMEDIATE | N/A | Not Inspected | ||
| PLUMBING - YARD WTR LINE/TEST | N/A | Not Inspected | ||
| PLUMBING - GAS PRESSURE TEST | N/A | Not Inspected | ||
| PLUMBING - GAS PRESS TEST FNL | N/A | Not Inspected | ||
| PLUMBING - SEWER HCS CONNECT | N/A | Not Inspected | ||
| PLUMBING - FINAL | N/A | Not Inspected | ||
| MECHANICAL - INTERMEDIATE | N/A | Not Inspected | ||
| MECHANICAL - FINAL | N/A | Not Inspected |