Permit: T01CM05154
Permit Details
Apply Date:
10/15/2001
Applicant:
METRO PERMIT EXPRESS, INC
Description:
TI:RESTAURANT
Architects:
- LOOKER, JEFF ANTHONY
Contractors:
- BUILDERS NATIONAL INC ,
Permit Reviews
Permit Number - T01CM05154
Permit Status: C of o
Permit Description: TI:RESTAURANT
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/15/2001 | 3RD PARTY COMMERCIAL TI | 12/14/2001 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T01CM05154
Permit Status: C of o
Permit Description: TI:RESTAURANT
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
10/15/2001 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T01CM05154
Permit Description: TI:RESTAURANT
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2001 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection 0000*1.N/H UNDERGROUND FOR SANITARY SEWER OK WATER TEST ONE TEN FOOT RISER OK 2.N/H UNDERGROUND FOR GREASE INTERCEPTOR TO OUTSIDE WALL OK WATER TEST ONE RISER TO TEN FOOT OK 3.) COMBO WASTE AND VENT SYSTEM INSTALLED PER PLAN. WATER TEST ONE TEN FOOT RISER OK 4.) OK TO BACKFILL ALL AREAS. 5.) WATER SERVICE TO INSIDE BLDG OK JOINTS SILFOS'D UNDER SLAB. PRESSURE TEST OK OK TO COVER. |
12/21/2001 | MECHANICAL - TEMP PWR FOR TEST | JMILITEL | Approved | IVRS - Inspection 0999*NO SPACE NUMBER POSTED ANYWHEREON SITE. NO CONTRACTOR ON SITE. NOT READY FOR TEMP POWER. |
12/21/2001 | PLUMBING - TEMP POWER FOR TEST | JSTANLEY | Approved | IVRS - Inspection 0000* |
12/21/2001 | ELECTRIC - TEMP POWER FOR TEST | MCAPISTR | Approved | IVRS - Inspection 0999*1.) THE PROPER PERMIT AND ELECTRICAL POWER NEEDED IS CONSTRUCTION POWER." 2.) THE TEMP POWER SETUP IN THE BUILDING WILL NOT SUPPORT 480VOLT. |
12/21/2001 | BUILDING - TEMP POWER FOR TEST | AMATHIES | Approved | IVRS - Inspection 0000* |
12/31/2001 | ELECTRIC - INTERMEDIATE | MCAPISTR | Approved | IVRS - Inspection 0000* |
01/31/2002 | PLUMBING - INTERMEDIATE | FMCCLURE | Approved | IVRS - Inspection 0000*03050 GAS P. FROM METER TO KITCHEN AT 60# 2.) DROP FAN W.H. OK. |
02/05/2002 | SHEET ROCK NAILING | AMATHIES | Approved | IVRS - Inspection 0000* |
03/07/2002 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | NO SINGLE WALL VENT PIPE ALLOWED ABOVE CEILING PLANS CALL FOR STAINLESS STEEL DUCT ON DISHWASHER. WILL CHECK ON FINAL. OK FOR CEILING TILES. |
03/07/2002 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection 0000* |
03/12/2002 | PLUMBING - GAS PRESSURE TEST | JMILITEL | Approved | IVRS - Inspection 0000*LEFT GAS CARD |
03/18/2002 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection 0000* OK FOR C OF O. |
03/18/2002 | PLUMBING - FINAL | FMCCLURE | Approved | IVRS - Inspection 0000* |
03/20/2002 | BUILDING - FINAL | RSUBA | Approved | IVRS - Inspection 0000* |
03/20/2002 | FRAMING | RSUBA | Approved | |
03/21/2002 | ELECTRIC - FINAL | MCAPISTR | Approved | IVRS - Inspection 0000*C OF O RECOMMENDED. |
03/21/2002 | ELECTRIC - ABOVE CEILING | MCAPISTR | Approved | |
03/21/2002 | ELECTRIC - UNDERGROUND | MCAPISTR | Approved | |
03/25/2002 | HEALTH DEPT - FINAL 724-7908 | AHAFFEY | Approved | |
03/26/2002 | SIGN - FINAL | JYBARRA | Approved | |
03/26/2002 | ENGINEERING - FINAL | DROBERTS | Approved | |
10/02/2002 | PERMIT FINALED | JYBARRA | Approved |