Permit: T01CM05081
Permit Details
Apply Date:
10/11/2001
Applicant:
LEJAS CORP
Description:
TI:AIRPORT
Contractors:
- LEJAS CORPORATION , THE
Permit Reviews
Permit Number - T01CM05081
Permit Status: Final
Permit Description: TI:AIRPORT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/11/2001 | COMMERCIAL TI | 03/04/2002 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T01CM05081
Permit Status: Final
Permit Description: TI:AIRPORT
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/11/2001 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T01CM05081
Permit Description: TI:AIRPORT
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2002 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection 0000*FINAL 1.) I NEED TO KNOW IF EXISTING SUB FLOOR WAS A FIRE RATED ASSEMBLY. IF IT IS THEN PENETRATIONS NEAR DATA RACKS MUST BE FIRE STOPPED. |
| 09/18/2002 | FRAMING | LHANLY | Approved | IVRS - Inspection 0000*REVISION FOR WALLS PER 2/A4 BRACED TO DECK RATHER THAN RUNNING UP TO DECK. |
| 09/20/2002 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection 0000* |
| 10/09/2002 | ELECTRIC - INTERMEDIATE | JORTA | Approved | IVRS - Inspection 0999*SESIMIC TIES ON FLOURSCENT FIXTURE ARE INCOMPLETE. ALSO WILL NEED HURRIANCE CLIPS. OR SCREWS, THORUGH T BAR AND INTO FIXTURE. MIN OF 2 @ END OF FIXTURE TELE CABLE OK LS PRODUCING TYPE.MIN PLACEMENT @ RECESSED FIXTURE DIAGONALLY ACROSS. FOLLOW SPECS MAY BE REQUESTING 4 TIES. |
| 10/10/2002 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection 0000* |
| 10/10/2002 | MECHANICAL - ABOVE CEILING | CWILLIAM | Approved | IVRS - Inspection 0000* |
| 12/13/2002 | ELECTRIC - FINAL | RMAJUTA | Approved | IVRS - Inspection 0999*TRACK LIGHTING CANNOT RELY ON TOGGLE BOLT THUR CEILING TILE FOR SUPPORT SIEMIC WIRES ATTACH LOOSELY AROUND TOGGLE BOLT UNACCEPTABLE SUPPORT METHOD. |
| 12/13/2002 | ELECTRIC - ABOVE CEILING | RMAJUTA | Approved | IVRS - Inspection 0999* |
| 03/11/2003 | PERMIT FINALED | DSANTACR | Approved | |
| 03/11/2003 | ELECTRIC - TEMP POWER FOR TEST | DSANTACR | Approved | |
| 03/12/2003 | FIRE SPKLR - FINAL | JEGAN | Approved | IVRS - Inspection 0000* |
| 03/13/2003 | FIRE - FINAL | JEGAN | Approved | IVRS - Inspection 0000* |